Building an ADU in the City of Riverside
City code and California law · Last reviewed October 9, 2026
The City of Riverside allows ADUs and junior ADUs in all residential zones, including multifamily and mixed-use zones with a home. On a single-family lot you can have an attached or converted ADU, a new detached ADU (or a movable tiny home, which the city calls a MADU) and a junior ADU. Detached ADUs can be up to 1,200 sq ft, and no parking is required. Through Dwell Riverside, the city offers four pre-reviewed ADU plans with a 3-business-day first review. This page covers the city, not unincorporated Riverside County. [1][2][3]
| ADUs allowed | Yes, in all residential zones, including multifamily and mixed-use zones with an existing or proposed home [1] |
|---|---|
| Number on a single-family lot | 1 attached or converted ADU + 1 new detached ADU or MADU + 1 junior ADU [1] |
| Detached ADU size | Up to 1,200 sq ft [1] |
| Attached ADU size | 50% of the house or 1,200 sq ft, whichever is less; at least 850 sq ft (1 bedroom or less) or 1,000 sq ft (2+ bedrooms) allowed [1] |
| Junior ADU | Up to 500 sq ft, inside the walls of the house [1] |
| Height (detached) | 20 ft for one story; 30 ft for two stories (20 ft and one story in the RC zone) [1] |
| Side and rear setbacks | 4 ft for new one-story ADUs under 16 ft; the zone's setbacks for taller ADUs (state law caps side and rear setbacks at 4 ft); none for conversions [1][6] |
| Parking | None required, and none to replace a converted garage [1] |
| Owner occupancy | Not for ADUs; the city code requires it for every junior ADU (under 2025 changes to state law: only if it shares a bathroom) [1][6] |
| Impact fees | No city impact fees under 750 sq ft; proportional above that [1] |
| Approval deadline | Completeness notice within 15 business days; approve or deny within 60 days of a complete application [6] |
| Short-term rental | No; ADUs, MADUs and JADUs must be rented for more than 30 days [1] |
On this page
What you can build in Riverside
The city's rules are in Riverside Municipal Code Chapter 19.442, last amended in 2025. ADUs, junior ADUs (JADUs) and movable ADUs (MADUs) are permitted in all residential zones, including multifamily and mixed-use zones with an existing or proposed home. There is no minimum lot size, and an ADU's floor area doesn't count toward lot coverage.
Single-family lots. Besides the house you can have one attached or converted ADU, one detached new-construction ADU or MADU, and one JADU. Lots developed under SB 9 follow the two-unit development chapter instead; see "Lot splits" below.
Multifamily lots. You can convert non-living space such as storage rooms, attics, basements or garages into ADUs: at least one, and up to 25% of the existing units. You can also build up to eight new detached ADUs on a lot with an existing apartment building (no more than the number of existing units), or two on a lot with a proposed one. MADUs aren't allowed on multifamily lots. The city's 2022 ADU FAQ still says two detached ADUs on a lot with existing apartments; the current code allows eight.
City or county? These rules apply only inside the City of Riverside. If your address is in unincorporated Riverside County, the county's Building & Safety department ((951) 955-1800) handles it. Statewide rules are on our California page. [1][4][5]
Size, height and setbacks
Size.
- Detached ADU: up to 1,200 sq ft.
- Attached ADU (including converted space in the house): up to 50% of the house or 1,200 sq ft, whichever is less, but never less than 850 sq ft for a unit with one bedroom or less, or 1,000 sq ft with more bedrooms. The city's FAQ gives an example: a 2,000 sq ft house can have a 1,000 sq ft attached ADU or a 1,200 sq ft detached ADU.
- JADU: up to 500 sq ft.
- MADU: 150 to 430 sq ft.
- Every ADU or JADU must be at least the size of an efficiency unit under the building code.
Height. Attached ADUs follow the zone's height limit. A one-story detached ADU (or MADU) can be 20 feet tall. A two-story detached ADU, or an ADU on the second floor of an existing accessory building, can be 30 feet. In the RC zone, detached ADUs are limited to 20 feet and one story.
Setbacks.
- Converting an existing structure: no additional setback. Adding a new second story to an existing structure: the zone's setbacks for the house.
- New one-story ADUs and MADUs under 16 feet tall: at least 4 feet from side and rear lot lines. The FAQ adds 4 feet from other buildings.
- New ADUs over 16 feet tall, and second-floor ADUs in new buildings: the zone's side and rear setbacks for the house.
- Front and street-side yards: the zone's setbacks apply in full. The FAQ says ADUs aren't allowed in front yards.
State law says a city can require a setback of "no more than four feet from the side and rear lot lines" for an attached or detached ADU, and that front setbacks can't block an ADU of at least 800 sq ft. If the zone's larger setbacks would affect your two-story ADU or your only buildable spot is in front, ask Planning how these rules apply. More on the state rules on our California page. [1][4][6]
Parking
Riverside requires no parking for any ADU, MADU or JADU. If you convert a garage, carport or covered parking for the house into an ADU, you don't have to replace those spaces. [1][4]
Dwell Riverside permit-ready plans
Dwell Riverside offers four pre-reviewed, single-story detached ADU plans, each in Craftsman, Ranch and Spanish styles:
- 746 sq ft, 1 bedroom, 1 bathroom
- 800 sq ft, 2 bedrooms, 2 bathrooms
- 1,020 sq ft, 2 bedrooms, 2 bathrooms
- 1,200 sq ft, 3 bedrooms, 2 bathrooms
Who qualifies. Your lot must be zoned single-family (R-1, RE, RR, RC or RA-5) with an existing or proposed house, must not be in a flood hazard area (check the FEMA flood map site), and must not be a designated or eligible cultural resource under Title 20. Planning reviews a signed eligibility form, and the city notes that approval of the form "does not guarantee eligibility."
What you fill in. The cover sheet (T1.1) of the plan set, a preliminary site plan marking where the ADU goes, a hold harmless agreement, and the clearance form, where you choose the elevation style and match the ADU's wall, roof, window and trim colors to the house. Properties in Very High Fire Hazard Severity Zones must use the plan's wildfire (WUI) specifications.
Speed. The first building plan review takes 3 business days, and any later reviews 10 business days. Plan sets and instructions are on the Permit-Ready ADU Plans page. See also our prefab ADU guide. [2][3][7]
Fees
City impact fees. The code says no city impact fees apply to ADUs under 750 sq ft. ADUs of 750 sq ft and over pay impact fees in proportion to the size of the house. State law exempts ADUs of 750 sq ft of interior livable space "or less," so ask the city how it treats an ADU of exactly 750 sq ft.
Utility connection fees. An ADU isn't treated as a new residential use for water and sewer connection fees or capacity charges, unless it's built with a new house. No new connection or capacity charge can be required for an ADU inside the existing house. A new detached ADU on a lot with an existing house may pay a connection fee or capacity charge proportionate to its burden, based on its size or number of plumbing fixtures. MADUs must be connected to water, sewer and electricity.
Other fees. Plan check and permit issuance fees apply, and the city says ADUs pay "some – but not all" of the impact and utility fees a new house pays, depending on the property. Under state law, ADUs and JADUs under 500 sq ft of interior livable space aren't subject to school impact fees. For a fee estimate call the One Stop Shop at (951) 826-5800. Our ADU cost guide covers typical budgets. [1][4][6]
How long it takes
State law requires the city to tell you within 15 business days whether your ADU application is complete, and to approve or deny a complete application within 60 days when a home already exists on the lot. A denial must come with a full list of what's deficient and how to fix it.
With a Dwell Riverside plan, the first plan review is 3 business days and later reviews 10 business days. After review, you download a conditions report from the permit portal; meeting those conditions may take extra steps and meetings with other departments. See our ADU permit process guide.
Historic properties. On a designated or eligible cultural resource, any property in a historic district, or a contributor in a neighborhood conservation area, you also need a Certificate of Appropriateness. The city's ADU design standards for historic properties (adopted February 19, 2025) are mandatory there unless staff grants an exemption, and Planning staff review these applications administratively. MADUs aren't allowed on historic properties. [1][2][6][8]
Garage conversions and junior ADUs
Garage conversions. Garages, workshops, guest quarters and parts of the house can be converted to an ADU or JADU. A converted structure needs no additional setback, you don't have to replace the garage parking, and no actions to correct zoning nonconformities related to physical improvements are required. Structures not built for living may need upgrades to meet the building code. See our garage conversion guide.
Junior ADUs. A JADU must be inside the walls of an existing or proposed house; an attached garage or other attached non-living space can be converted, but not a freestanding building. It can be up to 500 sq ft and needs cooking facilities (appliances, a food prep counter, refrigeration and storage) and either its own bathroom or a shared one. An attached ADU or JADU needs its own exterior entrance.
Owner occupancy conflict. Riverside's code (and its FAQ) allows a JADU only if the owner lives in the house or the JADU, recorded in a deed restriction that also bars selling the JADU separately. Under 2025 changes to state law (in effect by January 1, 2026), HCD says owner occupancy is required only if the JADU shares a bathroom with the house. Ask Planning which rule the city is applying before you record anything. More in our junior ADU guide. [1][4][6]
Renting, selling and lot splits
Renting. ADUs and MADUs can be rented separately from the house, and you don't have to live on the property. Any ADU, MADU or JADU that is rented must be rented for more than 30 days, so vacation rentals aren't allowed.
Selling. An ADU can't be sold separately from the house, except when the house and ADU were developed by a 501(c)(3) housing nonprofit or faith-based organization working with the Housing Authority to provide homes to low-income households.
Lot splits (SB 9). Two-unit developments are allowed in the R-1, RE, RR, RC, DSP-RES and NSP-MDR zones. An undivided single-family lot can have up to four homes in total, including up to two ADUs and JADUs. A lot created by an urban lot split can have up to two homes of any kind, including ADUs. Units built under these rules must be rented for more than 30 days, and unless the lot came from an urban lot split, the owner must live in one of the units. See our SB 9 guide. [1][4][9]
Permit steps in Riverside
Confirm you're in the city and check your zone
Make sure your address is in the City of Riverside, not unincorporated Riverside County, and check your zoning and any historic designation with the Planning Division through the One Stop Shop. [2][5]
Choose custom or permit-ready plans
Hire a licensed design professional for custom plans, or use a Dwell Riverside permit-ready plan if your single-family lot qualifies. For permit-ready plans, submit the Planning ADU eligibility and clearance form. [2][3][4][7]
Get a Certificate of Appropriateness if historic
If the property is a cultural resource, is in a historic district, or contributes to a neighborhood conservation area, the ADU must meet the city's historic ADU design standards and needs a Certificate of Appropriateness. [8]
Apply on the Public Permit Portal
Create an account on the Public Permit Portal and upload your plans and forms (for permit-ready plans: the plan set with completed T1.1, preliminary site plan, hold harmless agreement and clearance form). [2][3]
Review and conditions
Each department reviews the application. When review is done you get an email, and you download a conditions report from the portal that explains what's still needed, including visits to the One Stop Shop. [2]
Record the JADU deed restriction if needed
For a junior ADU, the city requires a recorded deed restriction barring separate sale and stating the owner-occupancy rule. Confirm the wording with Planning, since state law on JADU owner occupancy changed in 2025. [1][6]
Pay fees and get the permit
Once all conditions are met and fees are paid in full, the building permit is issued and you can download the approved plans. [2]
Pre-approved and sample plans
Dwell Riverside permit-ready ADU plans
Four pre-reviewed single-story detached plans (746 to 1,200 sq ft) in Craftsman, Ranch and Spanish styles, with a 3-business-day first plan review. [2][3]
Who to call
-
City of Riverside One Stop Shop (Community & Economic Development)
Planning and Building & Safety questions, ADU eligibility and fees (CDDINFO@riversideca.gov)
City Hall, 3900 Main Street, 3rd Floor, Riverside, CA 92522
-
City of Riverside Building & Safety Division
Plan check, permits and inspections (B&SInfo@RiversideCA.gov)
3900 Main Street, 3rd Floor, Riverside, CA 92522
Questions people ask
How big can an ADU be in Riverside?
A detached ADU can be up to 1,200 sq ft. An attached ADU can be up to half the size of the house or 1,200 sq ft, whichever is less, but at least 850 sq ft (one bedroom or less) or 1,000 sq ft (two or more bedrooms) is always allowed. A junior ADU can be up to 500 sq ft. [1]
Can I build a two-story ADU in Riverside?
Yes, in most zones. A two-story detached ADU, or an ADU on the second floor of an existing accessory building, can be up to 30 feet tall, but it must meet the zone's side and rear setbacks for the house. In the RC zone, detached ADUs are limited to one story and 20 feet. [1][4]
Does an ADU in Riverside need parking?
No. The city requires no parking for an ADU, MADU or junior ADU, and you don't have to replace garage parking you convert. [1]
Does the City of Riverside have pre-approved ADU plans?
Yes. Dwell Riverside offers four pre-reviewed single-story plans (746, 800, 1,020 and 1,200 sq ft) for single-family lots outside flood hazard areas that aren't cultural resources. The first plan review takes 3 business days. [2][3]
Can I put a tiny house on wheels in my Riverside backyard?
Yes, as a movable ADU (MADU) on a single-family lot: 150 to 430 sq ft, DMV-registered, connected to water, sewer and electricity, with the wheels and undercarriage screened. MADUs aren't allowed on multifamily lots, on historic properties, or between the house and the street. See our tiny house guide. [1][4]
Can I Airbnb my ADU in Riverside?
No. ADUs, MADUs and junior ADUs must be rented for terms longer than 30 days. [1]
Sources (9)
- Riverside Municipal Code Chapter 19.442, Accessory Dwelling Units (ADU) (through Ord. 7743, 2025), City of Riverside (Municode). Accessed October 9, 2026.
- Permit-Ready ADU Plans, City of Riverside Building & Safety Division. Accessed October 9, 2026.
- Dwell Riverside, City of Riverside Building & Safety Division. Accessed October 9, 2026.
- Accessory Dwelling Units (ADUs, JADUs and MADUs) FAQs (last revised 09/27/2022), City of Riverside Community & Economic Development Department. Accessed October 9, 2026.
- Building & Safety: Contact, City of Riverside Building & Safety Division. Accessed October 9, 2026.
- Accessory Dwelling Unit Handbook (March 2026), California Department of Housing and Community Development. Accessed October 9, 2026.
- ADU Pre-Approved Eligibility Form (Planning ADU Express Clearance Form, last revised 07/17/2025), City of Riverside Planning Division. Accessed October 9, 2026.
- Design Standards for Accessory Dwelling Units (ADU) on Historic Properties (adopted February 19, 2025), City of Riverside. Accessed October 9, 2026.
- Riverside Municipal Code Chapter 19.443, Two-Unit Developments (through Ord. 7744, 2025), City of Riverside (Municode). Accessed October 9, 2026.