Building an ADU in Glendale, California

City code and California law · Last reviewed October 9, 2026

Glendale allows ADUs in every zone that allows homes, under Municipal Code section 30.34.080. A new ADU can be up to 850 sq ft, or 1,000 sq ft with more than one bedroom, and a detached ADU of up to 800 sq ft with 4-foot side and rear setbacks is allowed regardless of floor area and lot coverage. After a long dispute with the state housing department, Glendale agreed in October 2025 to stop enforcing three of its rules: it must now allow ADUs above detached garages, a detached ADU on a lot with a guest house or similar building, and the full mix of ADUs state law allows. [1][2][3][4]

Glendale at a glance
ADUs allowedYes, in any zone that allows homes, on lots with an existing or proposed home [1]
Number on a single-family lotConverted ADU + JADU + new detached ADU (up to 800 sq ft), under the city's 2025 agreement with HCD [3][4][5]
ADU max size850 sq ft; 1,000 sq ft with more than one bedroom; city caps new attached ADUs at 50% of the house, but HCD says a percentage limit can't go below 850 sq ft [1][7]
Junior ADUUp to 500 sq ft inside a single-family home, including an attached garage [1]
Height (detached)16 ft; 18 ft within 1/2 mile walk of major transit (plus 2 ft for roof pitch) or on a lot with a multistory apartment building; 2 stories max [1]
Height (attached)25 ft or the zone limit, whichever is lower; 2 stories max [1]
Side and rear setbacks4 ft for new construction; none beyond fire safety to convert existing space [1]
ParkingNone for state-protected ADUs (up to 800 sq ft or conversions), JADUs, or near transit; otherwise up to 1 space [1][2]
Owner occupancyNot for ADUs. The city code still requires it for every JADU; state law since 2026 requires it only if the JADU shares a bathroom [1][7]
Impact feesNone under 750 sq ft (the city puts the fee at about $5,000); city code: proportional parks and library fee at 750 sq ft or more. State law: none at 750 sq ft or less [1][2][7]
Approval deadlineCompleteness in 15 business days; approve or deny within 60 days of a complete application [1][7]
Short-term rentalNo; ADU rentals must be longer than 30 days [1]
Selling an ADU separatelyNo, except a nonprofit sale under Gov. Code 66341; JADUs never [1]
On this page
  1. At a glance
  2. What you can build in Glendale
  3. Glendale's dispute with the state, and what it must now allow
  4. Size, height and setbacks
  5. Parking
  6. Fees
  7. How long it takes
  8. Garage conversions and junior ADUs
  9. Renting, selling and pre-approved plans
  10. Permit steps
  11. Pre-approved plans
  12. Who to call
  13. Questions people ask

What you can build in Glendale

ADUs are allowed in any zone that allows homes, on lots with an existing or proposed home. Glendale's rules are in Municipal Code section 30.34.080, last amended by Ordinance No. 6034 on December 3, 2024. The city's ADU page summarizes them for single-family and multifamily lots (updated November 7, 2025).

Single-family lots. The code allows, regardless of floor area, lot coverage and open space limits:

Larger ADUs (up to 850 or 1,000 sq ft) must also meet the zone's floor area, lot coverage, landscaping and open space rules. A JADU is allowed only on a lot with one home.

Multifamily lots. You can convert non-living space (storage rooms, boiler rooms, attics, basements, garages and similar) into at least one ADU and up to 25% of the existing units, rounded down. Or you can build up to eight detached ADUs on a lot with an existing apartment building (no more than the number of existing units), or two with a proposed one. The written code lets you choose one of these options, "but not both"; see the next section. JADUs are not allowed on lots with more than one home. For the state rules see our California page. [1][2]

Glendale's dispute with the state, and what it must now allow

California's housing department (HCD) found Glendale's ADU ordinance out of compliance in December 2023, issued a Notice of Violation in June 2024, and told the city its ordinance was "null and void" until fixed. The city disagreed. In December 2024 it amended the ordinance and fixed most issues, but kept three rules. In an August 2025 follow-up notice, HCD said those three still violate state law and that it had notified the Attorney General:

On October 3, 2025, Glendale and HCD signed a Memorandum of Understanding. The city, while maintaining it does not violate state law, agreed to bring an amended ordinance to the City Council by March 31, 2026. Until an amended ordinance takes effect (or the Council votes it down), the city agreed to allow, as long as they otherwise meet state ADU law:

The city posts a statement on the agreement on its ADU page. The City Council and Planning Commission agendas posted on the city's meeting portal from January through early October 2026 list no ADU ordinance amendment, and the online code still shows the older text, including the three challenged rules. Under the agreement, the city is not to enforce those three rules until an amended ordinance takes effect or the Council votes one down. Confirm the current rules with Planning before you design. [1][3][4][5][6]

Size, height and setbacks

Size. A new attached or detached ADU can be up to 850 sq ft, or 1,000 sq ft with more than one bedroom; the city's page says an ADU over 850 sq ft needs a second bedroom. The code also caps a new attached ADU at 50% of the house's floor area. HCD says a percentage-of-house limit can't hold an attached ADU below 850 sq ft, so if the 50% cap would cut yours below that, confirm with Planning. A JADU is up to 500 sq ft. Up to 800 sq ft of any ADU doesn't count toward the zone's floor area, lot coverage, open space or landscaping limits.

Height. On a single-family lot, a detached ADU can be 16 feet. Within a half-mile walk of a major transit stop or high-quality transit corridor it can be 18 feet, plus 2 feet to match the house's roof pitch; the city links a High Quality Transit Area map and says you are responsible for verifying. An attached ADU can be 25 feet or the zone's limit, whichever is lower. On multifamily lots, detached ADUs can be 16 feet, or 18 feet near transit (plus 2 feet for roof pitch) or when the apartment building is multistory. No ADU can exceed two stories, and parapets are limited to 18 inches.

Setbacks. New ADUs need 4 feet from interior lot lines. Converting existing living space or an accessory building, or rebuilding it in the same place and size, needs no added setback; conversions need building-code fire separation, and the code asks for at least one existing interior setback of 3 feet. On multifamily lots, detached ADUs must be 5 feet eave to eave from existing buildings.

Location. The code says a new ADU can't sit between the house and the street-front or street-side setback, and no new driveway is allowed from a street (an alley driveway is allowed). These limits don't apply when they would block a state-protected ADU, such as a detached ADU of up to 800 sq ft.

Design. ADUs over 800 sq ft follow the zone's standards. Objective design standards apply to the parts of a new ADU that face a street, sidewalk, alley or park, and to ADUs with a second story: roof form and materials matching the house, at least two cladding materials on facades facing the street, recessed windows, high sills on second-floor windows facing neighbors, and shielded downward lighting. State-protected ADUs are exempt from these design standards. Rooftop decks are not allowed on any ADU. On historic properties, exterior changes for an ADU must not be visible from the street, unless that would prevent a state-protected ADU. [1][2][7]

Parking

ADUs over 800 sq ft need up to one parking space per unit or per bedroom, whichever is less; it can be uncovered (8 by 18 feet), tandem, or on the existing driveway, and the ADU must share the house's driveway. No parking is needed when:

If you convert or tear down a garage, carport or parking space to build the ADU within its footprint, you don't have to replace the parking. [1]

Fees

Impact fees. ADUs under 750 sq ft are exempt from development impact fees, including the parks and library fee; the city's page says that fee is about $5,000. The code charges ADUs of 750 sq ft or more a parks and library fee in proportion to the size of the main house (or the average apartment size on a multifamily lot). State law bars impact fees on ADUs of 750 sq ft of interior livable space or less, so the two differ for an ADU of exactly 750 sq ft; confirm with Planning.

Utilities. An ADU or JADU is not treated as a new home for water and sewer connection fees unless it is built with a new house. State-protected ADUs don't need a separate utility connection. Other ADUs may need one, with a fee proportional to the ADU's size or plumbing fixtures. Check with Glendale Water & Power early to make sure the ADU, including a garage conversion, doesn't conflict with utility easements.

Other fees. You pay sewer, water and school district fees. Under state law, ADUs and JADUs under 500 sq ft of interior livable space are exempt from school fees. For permit fee estimates, call the Building Division at (818) 548-3200. For typical costs see our ADU cost guide. [1][2][7]

How long it takes

ADU permits are ministerial. The code says the city follows the state's permit processing deadlines: under state law it must tell you within 15 business days whether your application is complete, and approve or deny a complete application within 60 days when there is already a home on the lot, or the application is deemed approved.

Before you draw plans, the city asks you to review the rules and book a counter consultation with Planning/Zoning to screen your idea, and to clear the project with Glendale Water & Power. You then prepare a site plan, floor plan, elevations, roof plan, sections and a photo survey, and apply online for a building permit through the city's permit portal. See our ADU permit process guide. [1][2][7]

Garage conversions and junior ADUs

Garage conversions. You can convert an existing garage or other accessory building into an ADU, adding up to 150 sq ft only for entry and exit. It needs exterior access and fire-safe setbacks, and you don't replace the garage parking. Under the 2025 agreement with HCD, the city must also allow a new ADU built above a detached garage if it meets state law. See our garage conversion guide.

Junior ADUs. A JADU is up to 500 sq ft entirely inside a single-family home (an attached garage counts) and never in a detached building. It needs an efficiency kitchen with a sink, cooking appliances, a prep counter and storage, and independent access; if it has no bathroom of its own, it needs a separate entrance and an interior door to the house. Before final permit approval you record a covenant that bars selling it separately and requires the owner to live in the house or the JADU. Since January 1, 2026, state law requires owner occupancy only when the JADU shares a bathroom, so ask Planning how the city applies that rule. See our junior ADU guide.

Sprinklers. An ADU or JADU needs sprinklers only if the house is or was required to have them, and adding one doesn't trigger sprinklers in the house. [1][4][7]

Renting, selling and pre-approved plans

Any rental of an ADU must be for longer than 30 days, so short-term rentals are out. State law also bars short-term rental of JADUs. You don't have to live on the property to have an ADU. An ADU can't be sold separately from the house except as Government Code 66341 allows (sales by qualified nonprofits) or as other law allows, and a JADU can never be sold separately. For SB 9 lot splits, Glendale has separate rules in section 30.34.110; see our SB 9 lot split guide.

Pre-approved plans. Glendale's Standard ADU Plan Program offers an expedited review. As of October 2026 one plan is listed: a one-story, 740 sq ft, one-bedroom ADU by YD Group, bought directly from the designer. You still must confirm the project meets the zoning code before you apply. Program contact: Lea Issagholian, (818) 937-8139. See our prefab ADU guide. [1][2][7]

Permit steps in Glendale

  1. Review the rules and consult Planning

    Review the ADU rules and the city's MOU statement, then email Zoning@GlendaleCA.gov, call (818) 548-2140, or book a counter consultation. [2]

  2. Clear the site with Glendale Water & Power

    Check with GWP that the ADU, including any garage conversion, doesn't conflict with utility easements. [2]

  3. Prepare drawings

    Prepare a site plan, floor plan, elevations, roof plan, sections and a photo survey, or buy a pre-approved standard plan. [2]

  4. Apply for a building permit

    Apply online through the city's permit portal using the ADU building permit application for your property type. [2]

  5. Get a decision

    The city must say within 15 business days whether your application is complete and approve or deny a complete application within 60 days. [1][7]

  6. Record a JADU covenant if needed, build and pass inspections

    For a JADU, record the covenant and agreement before final permit approval. [1]

Pre-approved and sample plans

Who to call

Questions people ask

Can I build an ADU above my garage in Glendale?

Glendale's code bans new ADUs above detached garages, but under its October 2025 agreement with the state housing department the city agreed to stop enforcing that ban and to allow ADUs above detached garages that meet state ADU law. Confirm the current status with Planning. [1][3][4]

How big can an ADU be in Glendale?

A new ADU can be up to 850 sq ft, or 1,000 sq ft with more than one bedroom. The code also caps new attached ADUs at 50% of the house, though HCD says a percentage limit can't hold an ADU below 850 sq ft. A detached ADU up to 800 sq ft with 4-foot setbacks is allowed regardless of floor area and lot coverage. A JADU is up to 500 sq ft. [1][7]

How tall can a detached ADU be in Glendale?

16 feet, or 18 feet within a half-mile walk of major transit (plus 2 feet to match the house's roof pitch), and never more than two stories. [1]

Can I have a guest house and an ADU in Glendale?

The code allows an ADU or an accessory living quarters (such as a pool house or studio) but not both, though you can convert the guest house into the ADU. Under its 2025 agreement with HCD, the city agreed to allow a detached ADU on a property with an accessory living quarters if it meets state law. [1][4]

Are ADU fees waived in Glendale?

ADUs under 750 sq ft pay no development impact fee, which the city puts at about $5,000, and state law bars impact fees on ADUs of 750 sq ft or less. Larger ADUs may pay a proportional parks and library fee. Permit, utility and school fees still apply. [1][2][7]

Sources (7)
  1. Glendale Municipal Code § 30.34.080, Accessory dwelling units and junior accessory dwelling units, City of Glendale (eCode360). Accessed October 9, 2026.
  2. Accessory Dwelling Units, City of Glendale Community Development Department. Accessed October 9, 2026.
  3. Statement on Memorandum of Understanding between the Department of Housing and Community Development and the City of Glendale, City of Glendale. Accessed October 9, 2026.
  4. Memorandum of Understanding between the Department of Housing and Community Development and the City of Glendale (October 3, 2025), California Department of Housing and Community Development. Accessed October 9, 2026.
  5. City of Glendale: Non-Compliant Ordinance Under State ADU Law, Follow-up Notice of Violation (August 15, 2025), California Department of Housing and Community Development. Accessed October 9, 2026.
  6. City Council and Planning Commission Meetings (agendas and minutes), City of Glendale. Accessed October 9, 2026.
  7. Accessory Dwelling Unit Handbook (March 2026), California Department of Housing and Community Development. Accessed October 9, 2026.