What you can build

Prefab ADUs: modular, manufactured and factory-built units

Checked against state laws and official agency sources · Last reviewed October 9, 2026

"Prefab" covers two different kinds of homes under the law. A manufactured home is built on a permanent chassis to a federal code run by HUD. A modular or factory-built home is built to the state building code and approved through a state program, such as California's Factory-Built Housing program. A factory approval doesn't replace local rules: in California, the local building department inspects a factory-built unit's installation, and zoning and setbacks stay under local control. California law counts a manufactured home as an ADU. [1][2][3][4][5]

On this page
  1. Three ways to build an ADU
  2. Manufactured homes and the HUD code
  3. Modular and factory-built units: state approval
  4. You still need local permits
  5. Can a manufactured or prefab home be an ADU?
  6. Pre-approved ADU plans
  7. Costs
  8. Questions people ask

Three ways to build an ADU

[1][3][6][7]

Manufactured homes and the HUD code

HUD's Office of Manufactured Housing Programs enforces the federal construction and safety standards and installation standards. It enforces them "both directly and through state agencies," inspects factories, and authorizes "a certification label for each section of a compliant home." HUD's installation program was set up in 2008 "to ensure that all states have minimum installation standards and operating installation programs in place for manufactured homes."

The federal definition may change. HUD published a proposed rule, "Revising the Definition of 'Manufactured Home' to Lower Housing Costs," on June 12, 2026, with comments due August 11, 2026. It would let a section that forms part of an upper floor be built and moved without a permanent chassis. As of October 2026 it was still a proposal, not a final rule. Check HUD's manufactured housing page for the outcome.

HUD says homeowners can resolve complaints about a manufactured home through State Administrative Agencies and HUD. [2][8]

Modular and factory-built units: state approval

In California, HCD's Factory-Built Housing program regulates factory-built homes and building parts made for sale in the state. It works like this:

Some decisions stay with your city or county. HCD lists zoning, local snow and wind loads, fire zones, setbacks and yard rules, site development and property lines, and architectural and aesthetic review as reserved for the local building agency.

In Oregon, state law requires plan approval and inspection of prefabricated structures by certified or approved parties. It also requires an insignia of compliance or certification stamp for certain transactions. [3][4][6][9]

You still need local permits

A factory-approved unit doesn't skip the local permit. In California, the local building department "is responsible for inspecting the assembly and installation" of factory-built housing on site, using the approved plans. It may charge for that inspection "by local ordinance." Changes made during or after installation need approval from the design agency before installation, or from the local building department during or after it.

Zoning, setbacks and site development stay under local control as well, and so does the ADU permit itself. See the ADU permit process.

In Washington, a city may require a manufactured home to be new, set on a permanent foundation with the space underneath enclosed, built to local design standards, and thermally equivalent to the state energy code. [4][10]

Can a manufactured or prefab home be an ADU?

The Oregon and Washington laws cover where manufactured and prefab homes can be placed in general and are not written specifically for ADUs. Ask your city whether one can be permitted as an ADU on your lot.

Whatever the construction method, local zoning rules such as setbacks still apply. See what counts as an ADU. [4][5][10][11]

Pre-approved ADU plans

Some cities offer pre-approved ADU plans, which are designs the city has already reviewed. California law required local agencies to set up a program to pre-approve ADU plans by January 1, 2025, and to post them online. Seattle says that with a pre-approved backyard ADU plan, "in most cases, you can get your permit in just 2-6 weeks." Phoenix offers free pre-approved detached ADU designs that residents must submit "as is without modifications." [5][12][13]

Costs

UC Berkeley's 2021 statewide survey of California ADU owners reported costs for all ADU types together. The median construction cost was $150,000, or $250 per square foot. See our ADU cost guide, financing guide and hiring help guide. [14]

Questions people ask

What is the difference between a modular home and a manufactured home?

A manufactured home is built on a permanent chassis to HUD's federal standards and carries a HUD certification label on each section. A modular or factory-built home is built to the state building code. In California, it is approved through HCD's Factory-Built Housing program and carries a state insignia. The two are regulated separately: Oregon's prefabricated structure law expressly excludes manufactured dwellings. [1][2][3][6][9]

Can I put a manufactured home in my backyard as an ADU in California?

Yes, if it meets the rules. California's ADU law includes a manufactured home in its definition of an ADU. It must still meet state and local ADU standards and get local permits. Confirm with your city or county building department. [5]

Do prefab ADUs need a permit?

Factory approval covers how the unit is built, not your site. In California, the local building department still inspects the assembly and installation on site and may charge for it by local ordinance, and zoning, setbacks and site development stay under local control. Confirm the permits you need with your building department. [4]

Who inspects a factory-built ADU in California?

Two inspectors are involved. An HCD-approved Quality Assurance Agency inspects the unit in the factory. Your local building department inspects the assembly and installation on your lot. Contact HCD's Factory-Built Housing program at (800) 952-8356 with program questions. [3][4]

Sources (14)
  1. 24 CFR 3280.2 Definitions, U.S. Government (Electronic Code of Federal Regulations). Accessed October 9, 2026.
  2. HUD's Office of Manufactured Housing Programs, U.S. Department of Housing and Urban Development. Accessed October 9, 2026.
  3. Factory-Built Housing, California Department of Housing and Community Development. Accessed October 9, 2026.
  4. Factory-Built Housing (FBH), HCD FBH 315, California Department of Housing and Community Development. Accessed October 9, 2026.
  5. Accessory Dwelling Unit Handbook (March 2026), California Department of Housing and Community Development. Accessed October 9, 2026.
  6. ORS Chapter 455 (ORS 455.010 definitions, ORS 455.705 prefabricated structures), Oregon State Legislature. Accessed October 9, 2026.
  7. Information Bulletin 2016-01: Tiny Homes (May 2016, revised), California Department of Housing and Community Development. Accessed October 9, 2026.
  8. Revising the Definition of “Manufactured Home” to Lower Housing Costs (proposed rule, FR Doc. 2026-11851), U.S. Department of Housing and Urban Development (Federal Register). Accessed October 9, 2026.
  9. Factory-Built Insignia, California Department of Housing and Community Development. Accessed October 9, 2026.
  10. RCW 35.21.684 Authority to regulate placement or use of homes, Washington State Legislature. Accessed October 9, 2026.
  11. ORS Chapter 197A (ORS 197A.432 Siting of manufactured home or prefabricated structure), Oregon State Legislature. Accessed October 9, 2026.
  12. Accessory Dwelling Unit, Seattle Department of Construction and Inspections. Accessed October 9, 2026.
  13. Accessory Dwelling Units (ADU), City of Phoenix Planning and Development Department. Accessed October 9, 2026.
  14. First Ever Statewide ADU Owner Survey Shows Growth, Room for Improvement, Terner Center for Housing Innovation, UC Berkeley. Accessed October 9, 2026.