Building an ADU or backyard cottage in Seattle
City code and Washington law · Last reviewed October 29, 2026
Seattle allows accessory dwelling units (ADUs) in all zones where housing is allowed, and a lot can have up to two of them, attached, detached or stacked. A detached ADU is often called a backyard cottage (DADU). An ADU with up to two bedrooms can be 1,000 square feet, and one with three or more bedrooms can be 1,200 square feet.
No parking is required, and the city can't require you to live on the property. In Neighborhood Residential (NR) zones, which cover much of the city, an ADU needs a 5-foot rear setback (none on an alley) and side setbacks of 5 feet average, 3 feet minimum. Permits come from the Seattle Department of Construction and Inspections (SDCI), and a pre-approved backyard cottage plan can get a permit in 2 to 6 weeks in most cases. [1][2][3][4][5][6]
Seattle at a glance
- ADUs per lot
- Up to two (attached, detached or stacked) [1]
- Max size
- 1,000 sq ft gross floor area (up to 2 bedrooms) 1,200 sq ft (3+ bedrooms) [1]
- Not counted in size
- Up to 250 sq ft of attached garage, underground stories, up to 35 sq ft of bike parking [1]
- Height (Neighborhood Residential)
- 32 ft base limit, as for houses Lower limits for structures in required setbacks [1]
- Lot coverage (Neighborhood Residential)
- 50% maximum ADUs count toward coverage, density and floor area [3]
- Owner occupancy
- Not required Barred by state law [5]
- Short-term rental
- Allowed in a legal dwelling unit with a city license Register with RRIO if you don't live there [9]
On this page
What you can build in Seattle
Seattle's ADU rules are in Seattle Municipal Code 23.42.022. ADUs are allowed "in all zones where housing uses are allowed." No lot may have more than two ADUs, and they "may be attached, detached, or stacked." An ADU must be on the same lot as the main home.
SDCI calls an ADU inside or attached to the house an attached ADU (AADU), and one in a separate building a detached ADU (DADU), often called a backyard cottage. A lot may be big enough for four or more units in total, but only two of them may be ADUs.
These rules were rewritten to follow Washington's 2023 ADU and middle housing laws. Ordinance 127211 (ADUs) and Ordinance 127219 (interim middle housing rules) took effect June 30, 2025. The City Council then passed Ordinance 127376 in December 2025, which updated the ADU section and replaced the Neighborhood Residential zone code. See our Washington ADU law page for the state rules. [1][2][4][6]
Size, height and setbacks
Size. The gross floor area of an ADU with up to two bedrooms "may not exceed 1,000 square feet." With three or more bedrooms the limit is 1,200 square feet. A 1,500 square foot limit applies only in narrow cases in Lowrise zones. Up to 250 square feet of an attached garage, underground stories, and up to 35 square feet for long-term bike parking don't count.
Height and other standards. Unless the zone says otherwise, ADUs follow the same standards as the main home. In Neighborhood Residential (NR) zones the base height limit is 32 feet. Accessory structures in required setbacks are limited to 12 feet, with exceptions, so ask SDCI how this applies to your design.
Setbacks in NR zones:
- Rear: 5 feet for ADUs, or none if the rear lot line abuts an alley
- Side: 5 feet average and 3 feet minimum; 3 feet on lots under 5,000 square feet in frequent transit service areas
- Front: 15 feet on lots with one or two units, 10 feet with three or more
NR lots have a 50 percent lot coverage limit, and buildings must be at least 5 feet apart. ADUs count toward the lot's density, floor area and lot coverage. Other zones have different standards; check your zone on ADUniverse or with SDCI. [1][3]
Parking
"No off-street motor vehicle parking is required for an accessory dwelling unit." SDCI also lists parking, street improvements and mandatory housing affordability contributions among the standards that don't apply to ADUs. [1][2]
Fees
SDCI bases permit fees on the size and complexity of the project, the value of the work, extra permits needed, review time, inspections and technology fees. For a building permit that needs plan review, you pay 75 percent of the plan review and permit fees when your application is accepted, and the rest before the permit is issued. SDCI says this upfront payment rule doesn't apply to standard plan permits. Use the SDCI fee estimator and fee schedule to get an idea of cost.
SDCI reports every ADU permit to King County for its sewage treatment capacity charge. You'll fill out a form acknowledging that charge when you apply. For budgeting, see our ADU cost guide. [2][7]
Pre-approved backyard cottage plans
The Office of Planning and Community Development runs ADUniverse. It has a gallery of pre-approved DADU designs by local designers and architects, a step-by-step guide, and a tool to check whether an ADU is feasible on your lot. The city says that with a pre-approved plan, "In most cases, you can get your permit in just 2-6 weeks."
To use the faster standard-plan process, your project must:
- Use a pre-approved DADU plan in an NR1, NR2 or NR3 zone (no other zone qualifies)
- Have no environmentally critical areas on the property
- Have less than 750 square feet of total ground disturbance, including the structure and driveways
The city says some parts of ADUniverse may be out of date while it updates the site for the new state rules. [2][6][8]
Garage and other conversions
You can convert an existing accessory structure, such as a garage, into a DADU "notwithstanding applicable lot coverage or yard or setback provisions." This applies to structures that existed before July 23, 2023, or were replaced in the same configuration. The SDCI Director may also grant waivers to make the conversion work. The converted building must meet the city's minimum housing standards.
An attached ADU can be larger than 1,000 square feet if the part of the house it's in existed as of July 23, 2023. If you're converting a basement or other space in the house, you need a construction addition/alteration permit. See our garage conversion guide for general steps. [1][2]
Renting it out
Short-term rentals (fewer than 30 nights) are allowed in most dwelling units. If the rental is not in the home you live in, for example a backyard cottage you own, you must register with the city's Rental Registration and Inspection Ordinance (RRIO) program. You also need a business license tax certificate from the city's Finance and Administrative Services department, and every short-term rental must meet the city's regulatory license requirements. Ask SDCI at (206) 615-0808 for code questions, or email str@seattle.gov about licensing.
Tiny houses on wheels are treated like camper trailers, and you can't live in one on a lot in Seattle. A tiny house on a foundation is treated as a DADU. See our backyard tiny house guide. [2][9]
Older city guides may be out of date
SDCI's Tip 116B on backyard cottages is dated August 18, 2023, before the 2025 code changes. It still describes older rules, such as a 3,200 square foot minimum lot size and "SF5000" zone names, that don't appear in the current ADU section of the code. Where they differ, rely on the current code and confirm with SDCI. [1][10]
Permit steps in Seattle
Check your lot
Find your zone, and check whether an ADU is feasible, with the search tool on ADUniverse. Note any environmentally critical areas or shoreline location, which bring extra rules. [1][6][8]
Get coaching if you need it
SDCI's Applicant Services Center offers live chat, help tickets and video coaching sessions with permit specialists and land use planners, or you can send SDCI a question. [2][12]
Choose a pre-approved plan or a custom design
Pick a plan from the pre-approved DADU gallery for a faster permit, or have plans drawn. An attached or detached ADU needs a construction addition/alteration permit; legalizing an existing unit needs a construction permit to establish use. [2][6]
Apply on the Seattle Services Portal
Log in to the Seattle Services Portal and submit a Building & Land Use Pre-Application. Upload your site plan, plan set and the King County sewer capacity charge form. For a pre-approved plan, follow SDCI's standard plan instructions and enter the Standard Plan number. [8]
Pay fees and answer corrections
If your permit needs plan review (SDCI says this doesn't apply to standard plan permits), pay 75 percent of plan review and permit fees when the application is accepted. Respond to any review comments, then pay the remaining fees before the permit is issued. [7]
Get related permits
Electrical, plumbing and side sewer work may need their own permits. Seattle City Light handles electrical service changes, and Seattle and King County Public Health handles plumbing permits. [2][10][12]
Build and pass inspections
Schedule inspections through the Seattle Services Portal or call SDCI inspections at (206) 684-8950. When the work is done, request a final inspection. [10][12]
Pre-approved and sample plans
ADUniverse pre-approved DADU plans
A gallery of backyard cottage designs pre-approved by the city for NR zones; in most cases you can get a permit in 2 to 6 weeks. [6][8]
Who to call
-
Seattle Department of Construction and Inspections (SDCI)
ADU permits, plan review, zoning and building code questions
700 5th Ave, Suite 2000, Seattle, WA 98104
-
Construction inspections
-
Office of Planning and Community Development (ADUniverse)
ADUniverse site, pre-approved DADU plan gallery, ADU policy
-
SDCI short-term rental questions
Land use code rules for short-term rentals (licensing: str@seattle.gov)
Questions people ask
How big can an ADU be in Seattle?
An ADU with up to two bedrooms can have up to 1,000 square feet of gross floor area, and one with three or more bedrooms up to 1,200 square feet. Up to 250 square feet of attached garage, underground stories and up to 35 square feet of bike parking don't count. [1]
Can I build two backyard cottages in Seattle?
Yes. A lot can have up to two ADUs, and they may be attached, detached or stacked. Both count toward the lot's density, floor area and lot coverage limits. [1][3]
How close to the property line can a DADU be in Seattle?
In Neighborhood Residential zones, the rear setback for an ADU is 5 feet, or zero if the rear lot line abuts an alley. Side setbacks are 5 feet average and 3 feet minimum, or 3 feet on lots under 5,000 square feet in frequent transit service areas. [1][3]
How long does it take to get an ADU permit in Seattle?
With a pre-approved DADU plan in an NR zone, the city says you can get a permit in 2 to 6 weeks in most cases. For other projects, SDCI reviews your plans and may send corrections you must answer before the permit is issued. [6][7][8][10]
Do I have to live on the property to have an ADU in Seattle?
No. Washington law bars cities from requiring the owner to live in the ADU or the main house. SDCI lists a form to release an owner occupancy covenant for ADUs. [2][5]
Which zones allow ADUs in Seattle?
The code allows ADUs "as a housing use in all zones where housing uses are allowed." Unless the zone says otherwise, an ADU follows the same standards as the main home, so height, setbacks and lot coverage depend on your zone. Much of Seattle is zoned Neighborhood Residential (NR). Look up your zone on ADUniverse or ask SDCI. [1][3][4][6]
Can I build a backyard cottage in Seattle?
Yes, in any zone where housing is allowed. A backyard cottage is a detached ADU (DADU). You can have up to two ADUs on a lot, it can't be split off from the main house, and it needs a permit from SDCI. In NR zones it needs a 5-foot rear setback (none on an alley) and side setbacks of 5 feet average, 3 feet minimum. With one of the city's pre-approved DADU plans, the city says you can get a permit in 2 to 6 weeks in most cases. [1][2][3][6]
What are Seattle's rules for a mother-in-law apartment?
SDCI calls a legal unit inside or attached to the house an attached ADU (AADU); its older Tip 116A also calls it a "mother-in-law unit." It follows the same ADU rules: up to two ADUs per lot, 1,000 square feet with up to two bedrooms (1,200 with three or more), no parking required, and a permit from SDCI. A unit in the house isn't legal unless it was established through a permit. [1][2][11]
Can I rent out my ADU in Seattle?
Yes. The city can't require you to live on the property. Short-term rentals (fewer than 30 consecutive nights) are allowed in most dwelling units with a city license and business license tax certificate, and if the rental is a backyard cottage or other unit you don't live in, you must also register it with the city's Rental Registration and Inspection Ordinance (RRIO) program. [5][9]
Sources (12)
- Ordinance 127376 (Council Bill 120993), signed legislation, amending SMC 23.42.022 and adding new Chapter 23.44, City of Seattle. Accessed October 29, 2026.
- Accessory Dwelling Unit, Seattle Department of Construction and Inspections. Accessed October 29, 2026.
- Seattle's Neighborhood Residential Zone (zoning summary), Seattle Department of Construction and Inspections. Accessed October 29, 2026.
- Neighborhood Residential Code, Seattle Department of Construction and Inspections. Accessed October 29, 2026.
- RCW 36.70A.681 Accessory dwelling units — Limitations on local regulation, Washington State Legislature. Accessed October 29, 2026.
- Encouraging Backyard Cottages, Seattle Office of Planning and Community Development. Accessed October 29, 2026.
- How Much Will Your Permit Cost?, Seattle Department of Construction and Inspections. Accessed October 29, 2026.
- How To Apply for a Detached Accessory Dwelling Unit Using a Pre-Approved Standard Plan, City of Seattle, Seattle Services Portal Help Center. Accessed October 29, 2026.
- Short-Term Rentals, Seattle Department of Construction and Inspections. Accessed October 29, 2026.
- Tip 116B, Establishing a Detached Accessory Dwelling Unit (DADU), updated August 18, 2023, Seattle Department of Construction and Inspections. Accessed October 29, 2026.
- Tip 116A: Establishing an Attached Accessory Dwelling Unit (AADU) in Residential Zones (updated August 18, 2023), Seattle Department of Construction and Inspections. Accessed October 29, 2026.
- Applicant Services Center, Seattle Department of Construction and Inspections. Accessed October 29, 2026.