Building an ADU in Vancouver, Washington

City code and Washington law · Last reviewed October 9, 2026

In Vancouver, Washington, you can build up to two accessory dwelling units (ADUs) on a lot with a house, duplex, triplex, fourplex or townhome. An ADU must be 1,000 square feet or less, no parking is required, and impact fees are half those of the main home. The city's new zoning code took effect July 31, 2026, and ADUs are permitted through a Residential Building Permit (RES). [1][2][3]

Vancouver at a glance
ADUs per lotUp to two (attached, detached or one of each) [1][2]
Where allowedLow-Scale and Medium-Scale Neighborhood zones (possible but less likely in Mixed-Use and Regional Activity Center zones) [1]
Max size1,000 sq ft or less to count as an ADU [1][2]
Side and rear setbacks5 ft from neighboring lots; 0 ft from an alley (Flex-Plex building type) [2]
Height (Low-Scale Neighborhood zone)Three floors and 45 ft [2]
Spacing (detached ADU)10 ft from all other structures, or extra fire protection under the building code [1]
ParkingNone required [1][2]
Owner occupancyNot required [1][5]
Impact fees50% of the main home's impact fees (for up to two ADUs of 1,000 sq ft or less) [1][2]
Selling an ADU separatelyCity says ADUs can be sold as individual units [1]
Short-term rentalAllowed with a city permit ($265 application fee); citywide cap of 870 active permits [2][6]
On this page
  1. At a glance
  2. What you can build in Vancouver
  3. Size, height and setbacks
  4. Parking
  5. Fees
  6. Utilities
  7. Garage and other conversions
  8. Renting or selling it
  9. Permit steps
  10. Who to call
  11. Questions people ask

What you can build in Vancouver

Vancouver's city ADU page says "Up to two ADUs can be built on a lot." They can be attached, detached, a combination of both, or conversions of existing structures. An ADU must be on the same parent lot as a single-family house, duplex, triplex, fourplex, townhome or rowhome. If you add more than two units, they may still be allowed, but no more than two of them can be ADUs.

You can build ADUs in the Low-Scale Neighborhood (LS) and Medium-Scale Neighborhood (MS) zones. The city says ADUs may also be possible in the Mixed-Use Neighborhood and Regional Activity Center zones, but it is less likely because of their higher density requirements. Look up your zone with the Clark County Property Information Center.

New code. The city's updated Comprehensive Plan, zoning map and zoning code "went into effect on July 31, 2026." The new Title 20 zoning code regulates ADUs through "building types." A house with ADUs uses the Flex-Plex Building Type, a cluster of two to six units on one parent parcel. The copy of Title 20 that the city links from its permits page is dated May 5, 2026, so confirm the current standards for your lot with Land Use Planning. See our Washington ADU law page for the state rules behind these changes. [1][2][4]

Size, height and setbacks

Size. "A dwelling unit must be 1,000 square feet or less to be considered an ADU and qualify for reduced impact fees." A larger unit may still be allowed, but not as an ADU. The ADU can't be smaller than the Washington State Building Code requires.

Flex-Plex standards (the building type for a house with ADUs):

Height. Flex-Plex height follows the zone. In the Low-Scale Neighborhood zone the maximum is "Three (3) floors above the adjacent grade and forty-five (45’) feet."

Building code spacing. A detached ADU must be at least 10 feet from all other structures, including the house, decks, garage and sheds, or meet extra requirements such as sprinklers or 1-hour fire-rated construction. An ADU doesn't have to look subordinate to or match the main house. [1][2]

Parking

"Like all dwelling units, there are no minimum vehicle parking requirements for ADUs." The zoning code's parking table lists "None Required" for any residential use. If you choose to build parking, the code has rules for where it goes and what it's made of; in the Flex-Plex type, parking is reached from a side street or alley if one exists. [1][2]

Fees

Impact fees. Under VMC 20.450.030, impact fees for up to two ADUs of 1,000 square feet or less "shall be 50% of the principal unit." If the main house already exists, the ADU's fee is based on what the house's fee would be if it were built today. The city offers a residential impact fee deferral application on its residential permits page.

Permit fees. You pay plan review fees when your application is entered and the rest of the permit fees when plans are approved. A Request for Utility Services is free and gives an overview of costs to connect new units to water and sewer. A Pre-Application Conference for one to six units on one lot costs $382.

Tax relief. An ADU built as part of an addition or remodel may be eligible for property tax relief for up to three years. You must apply with the Clark County Assessor before construction is finished; see the Homeowner's Remodel Exemption. For budgeting help, see our ADU cost guide. [1][2][3]

Utilities

Some utilities can be shared between the house and one or two ADUs, but each unit needs separate shutoffs and its own temperature control. Ask Clark Public Utilities at 360-992-8558 whether you need a power upgrade or separate meter. If the property is on a septic system, check with Clark County Public Health. Before you apply for an ADU permit, you must submit a Request for Utility Services to find out whether a civil engineering review is needed. [1][3]

Garage and other conversions

The city says an existing garage or other accessory structure "may be converted into an Accessory Dwelling Unit (ADU), provided it can meet applicable zoning, building and safety standards."

Washington law goes further on setbacks: cities must allow ADUs in existing structures, including detached garages, "even if they violate current code requirements for setbacks or lot coverage." If your garage sits closer to the lot line than the code allows, raise this with Land Use Planning.

Attached ADUs need 1-hour fire-rated construction and STC/IIC 45 sound separation. The city makes one exception: a single ADU created entirely inside an existing home may not need that separation if hard-wired interconnected smoke detectors run through the home and ADU. In that case the converted space needs a finished ceiling at least 6 feet 8 inches high and legal egress windows. Multiple ADUs, detached ADUs and ADU additions need full fire and sound separation. See our garage conversion guide. [1][5]

Renting or selling it

You don't have to live on the property to have an ADU. You can live in it, rent it, or sell it; the city says ADUs "can be sold as individual units." Selling one separately may involve a land division, so ask Land Use Planning what your lot would need. Long-term rentals must be registered and periodically inspected.

A short-term rental (fewer than 30 consecutive nights) needs a city permit, a state and city business license, liability insurance and a notice letter to your neighbors. The application fee is $265. The city may issue no more than 870 active short-term rental permits at a time, first come, first served, and permits expire when the property changes hands. Short-term rentals can't operate in an accessory structure that isn't a legal dwelling unit. [1][2][6]

Permit steps in Vancouver

  1. Check your zone and property

    Look up your property and zoning on the Clark County Property Information Center or the city's Property Information Lookup. [1]

  2. Request utility services (required, free)

    Submit a Request for Utility Services before applying, unless you had a Pre-Application Conference in the last 365 days. It shows water and sewer availability and costs, and whether you need a civil engineering (ENG) permit. Questions: Permit Center Engineering, 360-487-7804. [1][3]

  3. Get advice if you want it

    Book a free 30-minute virtual appointment with Permit Center staff, or pay $382 for a Pre-Application Conference with a written staff report. Both are explained on the Residential Building Permits page. [3]

  4. Apply for a Residential Building Permit (RES)

    Use the New Housing or Dwelling Unit, including ADU, application and submittal checklist. Email the completed form to eplans@cityofvancouver.us, pay plan review fees, then upload plans in ePlans. [3]

  5. Answer review comments

    Reviewers check planning and zoning, structural and fire requirements. If they need changes, you'll get an email and respond in ePlans. [3]

  6. Pay fees and get your permit

    When all reviews are approved, pay the final fee total, including impact fees. Then download the approved plans, permit and inspection card from ePlans. [2][3]

  7. Build and schedule inspections

    Keep the approved plans and inspection card on site and schedule inspections as you build. Inspectors post results online. [3]

Who to call

Questions people ask

How big can an ADU be in Vancouver, WA?

A unit must be 1,000 square feet or less to count as an ADU and get the reduced impact fees. A larger unit may still be allowed, but as a regular dwelling unit, not an ADU. [1]

How many ADUs can I build in Vancouver, WA?

Up to two per lot. You can add more units, but no more than two of them can be ADUs. [1]

Do I need parking for an ADU in Vancouver, WA?

No. The city says there are no minimum vehicle parking requirements for ADUs, and the zoning code requires no parking for any residential use. [1][2]

How much are impact fees for an ADU in Vancouver, WA?

Half of what the main home would pay. For up to two ADUs of 1,000 square feet or less, impact fees are 50 percent of the principal unit's, calculated as if the house were built today. [1][2]

Do I have to live on the property?

No. The city says the owner is not required to live on the property where an ADU is located, and state law bars cities from requiring it. [1][5]

Sources (6)
  1. ADU, Accessory Dwelling Units, City of Vancouver, WA. Accessed October 9, 2026.
  2. Vancouver Municipal Code Title 20, Land Use and Development Code (dated as of May 5, 2026; effective July 31, 2026): 20.410.050, 20.420.100, 20.430, 20.450.030, 20.450.045, 20.190, City of Vancouver, WA. Accessed October 9, 2026.
  3. Residential Building Permits, City of Vancouver, WA. Accessed October 9, 2026.
  4. Long Range Planning, City of Vancouver, WA. Accessed October 9, 2026.
  5. RCW 36.70A.681 Accessory dwelling units — Limitations on local regulation, Washington State Legislature. Accessed October 9, 2026.
  6. Short-Term Rentals (STR), City of Vancouver, WA. Accessed October 9, 2026.