Building an ADU in Bellingham

City code and Washington law · Last reviewed October 10, 2026

Bellingham allows up to two accessory dwelling units (ADUs) on a lot with a house, duplex, triplex, fourplex, townhome or other main home, anywhere residential development is allowed except the Lake Whatcom watershed. Each ADU can be up to 1,000 square feet. No parking is required and you don't have to live on the property. You need both an ADU land use permit and a building permit, and most ADUs go through the city's simplest Type I review. [1][2]

Bellingham at a glance

ADUs per lot
Up to two, attached or detached [1][2]
Where allowed
All areas that allow residential development, except the Lake Whatcom watershed [1]
Max size
1,000 sq ft per ADU Up to 800 sq ft of attached garage, shed or workshop space allowed on one detached ADU [1][2]
Height
Attached: 35 ft (height definition #1) or 20 ft (#2) Detached: 24 ft (#1) or 12 ft (#2) [1][2]
Setbacks (attached ADU)
Front 10 ft Rear 10 ft (0 on an alley); interior side 5 ft (0 on an alley); corner flanking side 10 ft [2]
Setbacks (detached ADU)
City Quick Guide: front 10 ft Rear 0 ft; interior side 5 ft (0 on an alley), none in the rear 32 ft of the lot; corner flanking side 10 ft. The code is worded differently; confirm with the Permit Center [2][4]
Open space
At least 30% of the lot [1][2]
Parking
None required [1][2]
Owner occupancy
Not required [1][6]
Selling an ADU separately
Allowed as a condominium unit [1]
Permit type
Type I (staff decision) for most ADUs Land use permit must be approved before the building permit is issued [1]
Short-term rental
Not permitted in detached ADUs in residential single or multiple areas [3]
On this page
  1. At a glance
  2. What you can build in Bellingham
  3. Size, height and setbacks
  4. Parking and owner occupancy
  5. Which permit process you'll go through
  6. Fees and timeline
  7. Renting it out
  8. Pre-approved plans, legalizing a unit and other housing options
  9. How this fits state law
  10. Permit steps
  11. Pre-approved plans
  12. Who to call
  13. Questions people ask

What you can build in Bellingham

Bellingham has allowed ADUs since 1995. An ADU can sit on a lot with a single-family home, duplex, triplex, fourplex, townhome or other main home. You can have up to two, attached (A-ADU) or detached (D-ADU). Examples include a converted garage, a unit in an attic or basement, or an addition with its own entrance.

ADUs are allowed in "All areas that allow residential development (except for the Lake Whatcom watershed )," including residential single, residential multi and urban village zones. The detailed rules are in Bellingham Municipal Code 20.10.036. The city's ADU page and ADU Quick Guide, both updated September 17, 2026, summarize them. [1][2]

Size, height and setbacks

Size. Each ADU can be up to 1,000 square feet. One detached ADU may also have up to 800 square feet of attached ancillary space, such as a garage, workshop or shed, if it has an outside door. Going past that needs a Type III-A conditional use permit, and even then each detached ADU stays capped at 1,000 square feet.

Height. An attached ADU can be 35 feet under height definition #1 or 20 feet under definition #2. A detached ADU can be 24 feet under definition #1 or 12 feet under definition #2. The city explains the two definitions in its building height guide.

Setbacks.

The code itself words the detached ADU setbacks differently. BMC 20.10.036 says "A five-foot side and rear yard setback shall be provided," with no setback needed from an alley, and that a detached ADU "may be located in a rear yard and in the rear 22 feet of an interior side yard." The Quick Guide shows a 0-foot rear setback and the rear 32 feet. Confirm the setbacks for your lot with the Permit Center before you design.

At least 30 percent of the lot must be open space. [1][2][3][4]

Parking and owner occupancy

No parking is required for an ADU. If you choose to add parking, it must meet the standards in BMC 20.10.036(B)(9) and 20.12.010.

You don't have to live on the property. Owners used to have to record a "Covenant for Owner Occupancy." If one is still recorded on your property, you can record a release at the Whatcom County Auditor's Office using the city's release of covenant form. [1][2]

Which permit process you'll go through

You need both a land use (ADU) permit and a building permit. The land use permit must be approved before the building permit is issued, but you can submit them at the same time.

[1][3]

Fees and timeline

Expect an ADU application fee, transportation and park impact fees, and building, plumbing, mechanical and electrical permit fees. The city's ADU homeowner's handbook estimates these impact fees, due when the building permit is issued:

Impact fees change from year to year, so confirm them with the Permit Center. If the ADU's added fixtures exceed what your water meter can deliver, Public Works may require a larger meter. In addition to the cost of the meter, you then pay water and sewer system development charges, about $7,000, at permit issuance. Some alleys also need improvements if you plan vehicle access from them.

The handbook's estimated timeline is 3 to 5 months to get started, 1 to 2 months for permits under current Type I timelines, and 6 to 12 months for construction. See our ADU cost guide for budgeting. [3]

Renting it out

Every rented ADU in the city must register with Bellingham's Rental Registration program. An attached ADU is exempt from the fees and inspections if there are no other rental units on the property and the owner lives in the main home or the ADU. Detached ADUs are not exempt.

The handbook says short-term rentals, such as Airbnb or VRBO, "are not permitted in D-ADUs in residential single or multiple general use type areas." Where a short-term rental is allowed in a legal ADU, you can get a short-term rental permit for the main home or the ADU, but not both. [1][3]

Pre-approved plans, legalizing a unit and other housing options

Bellingham has one set of registered, pre-approved ADU plans. You still need both permits, but the building permit review "should be faster and less expensive." Plans are bought from the architect of record; ask the Permit Center about site planning first.

If you have an unpermitted ADU, you must apply to legalize it, and units that aren't legalized face enforcement. Existing units must meet the same rules as new ADUs, including building codes.

ADUs aren't the only option. An interim ordinance allows infill housing, up to 6 units per lot, in areas zoned mainly for residential use, except property in the Lake Whatcom Reservoir area. It took effect December 23, 2025, and runs until December 4, 2026, unless the City Council acts. [1][5]

How this fits state law

Washington's ADU law (RCW 36.70A.681) requires cities to allow at least two ADUs per lot in urban growth area zones that allow single-family homes, bars owner-occupancy rules, and says a city can't cap ADU size below 1,000 square feet. Bellingham allows two ADUs, sets a 1,000-square-foot size limit and doesn't require owner occupancy.

Height is a possible conflict. The city's detached ADU limit is 24 feet under height definition #1 or 12 feet under definition #2. State law says a city may not set ADU roof height limits "of less than 24 feet, unless the height limitation that applies to the principal unit is less than 24 feet." The city's height guide says each zone's rules specify which height definition can be used. Ask the Permit Center which limit applies to your lot.

State law says cities must adopt these requirements "to take effect at the same time as the jurisdiction's next periodic comprehensive plan update." For Whatcom County cities, that update was due "On or before December 31, 2025." See our Washington ADU law page. [1][4][6][7][8][9]

Permit steps in Bellingham

  1. Check your property

    Confirm your lot allows residential development and isn't in the Lake Whatcom watershed. Review the ADU Quick Guide for size, height and setback limits. [1][2]

  2. Talk to the Permit Center

    With a basic design in hand, visit the Permit Center at City Hall, 210 Lottie Street, or contact it at (360) 778-8300 or permits@cob.org. Check with Public Works early about water meter size and alley access. [3][10]

  3. Apply for the ADU land use permit

    Submit the ADU permit application. Most ADUs go through a Type I staff review; projects with seven or more homes or extra ancillary space need Type II or Type III-A review. [1]

  4. Apply for the building permit

    Submit the building permit application, at the same time or after. Building and land use applications are submitted by email to permits@cob.org. [1][3][10]

  5. Pay fees and get your permits

    When review is done and fees are paid, the city issues the ADU permit and then the building permit. Impact fees and any water and sewer charges are due at building permit issuance. [3]

  6. Build, pass inspections and register if renting

    Schedule inspections through eTRAKiT, the city's online permitting system. After final approval, register the ADU with the Rental Registration program if you rent it out. [1][3][10]

Pre-approved and sample plans

Who to call

Questions people ask

How many ADUs can I build in Bellingham?

Up to two per lot, attached or detached, with a single-family home, duplex, triplex, fourplex, townhome or other main home. [1]

How big can an ADU be in Bellingham?

Up to 1,000 square feet each. One detached ADU can also have up to 800 square feet of attached ancillary space like a garage or workshop. [1][2]

Do I need parking for an ADU in Bellingham?

No. Parking is not required. If you add it anyway, it must meet the city's parking standards. [1][3]

How long does it take to get an ADU permit in Bellingham?

The city's handbook estimates 1 to 2 months for permits under current Type I timelines, after 3 to 5 months of planning and before 6 to 12 months of construction. Type II and Type III-A reviews take longer. [1][3]

Can I rent my Bellingham ADU on Airbnb?

Not if it's a detached ADU in a residential single or multiple area, according to the city's handbook. Any rented ADU must be registered with the city's rental registration program. [1][3]

Sources (10)
  1. Accessory Dwelling Units (ADUs), City of Bellingham Planning and Community Development. Accessed October 10, 2026.
  2. Accessory Dwelling Units (ADU) Quick Guide (09/17/2026), City of Bellingham Planning and Community Development. Accessed October 10, 2026.
  3. Homeowner's Handbook to Building an ADU: Making Room in Bellingham (updated with 2025 code amendments), City of Bellingham. Accessed October 10, 2026.
  4. Bellingham Municipal Code 20.10.036 Accessory dwelling units, City of Bellingham. Accessed October 10, 2026.
  5. Ordinance No. 2025-12-032 (Extended Interim Middle Housing Ordinance), City of Bellingham. Accessed October 10, 2026.
  6. RCW 36.70A.681 Accessory dwelling units — Limitations on local regulation, Washington State Legislature. Accessed October 10, 2026.
  7. RCW 36.70A.680 Accessory dwelling units — Local regulation, Washington State Legislature. Accessed October 10, 2026.
  8. RCW 36.70A.130 Comprehensive plans — Review procedures and schedules — Amendments, Washington State Legislature. Accessed October 10, 2026.
  9. Building Height Calculation Instructions, City of Bellingham Permit Center. Accessed October 10, 2026.
  10. Permits, City of Bellingham Permit Center. Accessed October 10, 2026.