Building an ADU in Boulder
City code and Colorado law · Last reviewed October 9, 2026
Boulder allows an accessory dwelling unit (ADU) by right on a lot with a detached house in most zoning districts. A detached ADU can be up to 800 square feet, and an attached ADU up to half the house or 1,000 square feet, with larger limits for affordable ADUs and historic properties. Since March 8, 2025, you don't have to live on the property. You get approval through a regular building permit, and you can rent the ADU long term with a rental license, but not short term. [1][2]
| Where allowed | By right on a lot with a detached house in all zoning districts except RH-6, MH, BMS, BCS, IS-1 and IM [2] |
|---|---|
| Detached ADU max size | 800 sq ft (1,000 sq ft for affordable ADUs and designated historic properties) [1][2] |
| Attached ADU max size | Half the house's floor area or 1,000 sq ft, whichever is less; 750 sq ft if the house is under 1,500 sq ft [2] |
| Detached ADU height | 20 ft; up to 25 ft with a roof pitch of 8:12 or steeper [2] |
| Attached ADU height | Same as the main building: 35 ft in districts that allow ADUs [2] |
| Setbacks | Zoning district setbacks; 5 ft minimum rear setback for attached ADUs; detached ADUs 6 ft from other buildings [2] |
| Owner occupancy | Not required since March 8, 2025 [1] |
| Fire sprinklers | Required in detached ADUs [1] |
| Long-term rental | Allowed with a city rental license [2][6] |
| Short-term rental | Not allowed in the ADU or the main house (unless both were set up before Feb. 1, 2019) [1][2] |
| Selling separately | Not allowed [2] |
| State ADU law | A HB24-1152 subject jurisdiction and a certified ADU Supportive Jurisdiction (as of Oct. 9, 2026) [3][7] |
On this page
What you can build here
Boulder has simplified its ADU rules several times. Since September 1, 2023, ADUs are approved through the regular building permit process with no separate administrative review, and there is no longer a "saturation limit" on ADUs in a neighborhood. City Council approved more changes in February 2025 (Ordinance 8650), which apply to ADUs proposed on or after March 8, 2025. Boulder is a subject jurisdiction under Colorado's ADU law, HB24-1152. See our Colorado ADU law page.
An ADU is allowed by right on a lot with a detached house in every zoning district except RH-6, MH, BMS, BCS, IS-1 and IM. It must have separate kitchen, sleeping and bathroom facilities, and it can be attached to the house (including a basement unit) or detached. An attached ADU must be separated from the house by a wall or a lockable door.
Modular ADUs approved by the state still need a Boulder building permit and must meet local building and zoning codes. See our prefab ADU guide. [1][2][3]
Size, height and setbacks
Size.
- Attached ADU: half of the house's floor area or 1,000 square feet, whichever is less. If the house has under 1,500 square feet, the limit is 750 square feet.
- Detached ADU: 800 square feet.
- Affordable ADUs and designated historic properties: attached, two-thirds of the house or 1,200 square feet, whichever is less (750 square feet if the house is under 1,125 square feet); detached, 1,000 square feet.
Floor area is measured to the outside of the exterior walls and includes stairways. Uninhabitable space, such as areas with ceilings 6 feet or lower and mechanical rooms, doesn't count.
Height. A detached ADU can be 20 feet tall, or up to 25 feet with a roof pitch of 8:12 or steeper; dormers are allowed within limits. A building converted to a detached ADU can stay above 20 feet if you don't change its height, floor area or roof form. An attached ADU follows the main building height limit, which is 35 feet in all districts that allow ADUs.
Setbacks and other zoning rules. ADUs must meet the district's setbacks. An attached ADU needs at least a 5-foot rear setback. A detached ADU must be at least 6 feet from any other building. Floor area ratio, building coverage, solar access, side yard bulk plane and wall articulation rules apply in many districts, and landscaping may be required. [1][2]
Fire sprinklers, utilities and building code
Every ADU must meet the city's building code. Detached ADUs must have automatic fire sprinklers. The sprinkler system must connect to a dedicated sprinkler water line through a bypass water meter. Boulder Fire-Rescue can approve "mist type" systems as alternates when shown to be equivalent to standards such as NFPA 13D. HB24-1152 lets cities keep applying their building and fire codes to ADUs.
A detached ADU also needs an In-Property Wet Utility Permit for the water and sewer lines from the house. Even if you create an ADU inside an existing permitted space with no construction, you need a "change of use" building permit to show life safety standards are met and existing meters and services are adequate.
Detached ADUs must meet the city's SmartRegs energy rules when rented, and so must the main house of any property with an ADU. Attached ADUs don't need to. [1][2][4]
Parking, owner occupancy and HOAs
Boulder's ADU page says that as of March 8, 2025, ADUs are "no longer required to be owner occupied, in accordance with recent state legislation."
Boulder's ADU pages don't list a parking requirement. Under HB24-1152, a subject jurisdiction can't make you build a new parking space for an ADU, except in narrow cases, though it may ask you to designate an existing driveway or garage space.
Since March 8, 2023, ADU bans in prior planned unit developments and other prior approvals are void, but you need an approved minor modification before you apply for the building permit, and the ADU must still meet the PUD's other requirements. The city says it can't overrule an HOA, but notes that state law addresses HOA restrictions on ADUs. Under HB24-1152, HOA rules that restrict ADUs in ways the law prohibits are void in subject jurisdictions, though reasonable restrictions are allowed. [1][3][4]
Garage conversions and legalizing existing units
You can convert an existing structure, such as a garage or studio, into a detached ADU. If you keep its height, floor area and roof form, it can exceed the usual 20-foot height limit. It still needs a building permit, sprinklers and the other detached ADU standards. See our garage conversion guide.
Boulder says unpermitted ADUs are common and can now be legalized. You need stamped plans from a licensed design professional, and finishes like drywall may have to come off so inspectors can check framing, insulation, plumbing, mechanical and electrical work. Existing detached ADUs need fire suppression to legalize. [1][2]
Fees and timeline
Boulder's ADU pages don't list ADU-specific fees. Building permit fees are paid as part of the permit, and the permit is closed only once inspections, conditions and fees are complete. Ask Planning & Development Services at 303-441-1880 about fees for your project, and see our ADU cost guide.
Review times vary with the scope of the project and how complete your application is. The city posts current processing times. Boulder doesn't offer pre-review of building permit applications; once your application is in review, staff tell you what needs correcting. See our ADU permit process guide. [1][5]
Renting it out and selling
Long-term rental (30 days or more) of the ADU, the main house or both is allowed. Every rented ADU needs a city rental license, and staff may inspect the ADU for its approval criteria as part of licensing. Contact Rental Housing Licensing at 303-441-3152.
Short-term rental (under 30 days) of either the ADU or the main house is prohibited, unless the ADU and its rental license were set up before February 1, 2019. HB24-1152 lets cities regulate short-term rental of ADUs.
Affordable ADUs. If you agree to keep rent at or below the city's affordability standard (75% of area median income), you can build a larger ADU. A Declaration of Use is recorded with the Boulder County Clerk and Recorder.
You can't sell an ADU separately from the main house. [1][2][4][6]
Financing and state programs
Boulder is on DOLA's list of certified ADU Supportive Jurisdictions as of October 9, 2026. That means homeowners may qualify for the Colorado Housing and Finance Authority's ADU interest rate buydown or credit enhancement programs, applied for through a lender of your choice. CHFA describes the programs as supporting ADUs for low- and moderate-income borrowers and/or tenants. See CHFA's ADU finance programs and our ADU financing guide. To compare nearby rules, see our Denver and Fort Collins pages. [7][8]
Permit steps in Boulder
Check your zoning district
Look up your district on the city's zoning map. The same mapping shows historic, floodplain and overlay rules that can add requirements. [1][2]
Clear any prior approvals
If your property is in a PUD, planned development or site review approval, complete a minor modification before you apply for the building permit. A home with a permanent affordability deed restriction isn't eligible for an ADU. [1][2]
Design to the ADU standards
Follow the size, height, separation and zoning rules in the city's ADU guide. The city has no pre-review service, so it suggests a licensed architect or design professional who knows Boulder codes for design questions. [1][2]
Prepare the ADU materials
Along with the normal permit materials, show lockable separation and floor plans of each level of the house (attached ADUs) or the roof pitch (detached ADUs). Add the ADU Application Form, and a signed Declaration of Use for an affordable ADU. [2]
Apply in the Customer Self-Service Portal
Apply for a building permit through the city's Customer Self-Service Portal. A detached ADU also needs an In-Property Wet Utility Permit for the water and sewer connections from the house. [2][5]
Respond to plan review
Staff send correction requests once the permit is in review. Review times depend on scope and completeness; the city posts current processing times. [1][5]
Inspections and rental license
Schedule inspections in the portal. The permit closes once inspections, conditions and fees are complete. If you will rent the ADU or the house, get a rental license. [5][6]
Who to call
-
Planning & Development Services
Building permits, ADU zoning questions and inspections
1101 Arapahoe Avenue, Boulder, CO 80302 (Tuesday to Friday, 10 a.m. to 4 p.m.)
-
ADUs on landmarks or contributing properties in historic districts: historic@bouldercolorado.gov
-
Rental licenses for ADUs and main houses: RHL@bouldercolorado.gov
Questions people ask
How big can an ADU be in Boulder?
A detached ADU can be 800 square feet. An attached ADU can be half the house or 1,000 square feet, whichever is less, or 750 square feet if the house is under 1,500 square feet. Affordable ADUs and designated historic properties get larger limits. [2]
Do I have to live on the property to have an ADU in Boulder?
No. Since March 8, 2025, Boulder no longer requires ADU properties to be owner occupied, in line with state law. [1]
Can I Airbnb my ADU in Boulder?
No. Short-term rental of the ADU or the main house is prohibited unless the ADU and rental license were set up before February 1, 2019. Long-term rentals with a rental license are allowed. [1][2]
Does a detached ADU in Boulder need fire sprinklers?
Yes. Detached ADUs need automatic fire sprinklers on a dedicated water line with a bypass meter. Boulder Fire-Rescue may approve an equivalent mist system. [1]
Can I build an ADU in a Boulder PUD?
Yes. Since March 8, 2023, ADU prohibitions in prior PUDs and similar approvals are void, but you must get a minor modification before you apply for the building permit. [1][2]
Can I legalize an unpermitted ADU in Boulder?
Yes, through a building permit. You'll need stamped plans from a licensed design professional, the unit must meet current codes, and finishes may have to be opened up for inspection. [1]
Sources (8)
- Accessory Dwelling Units, City of Boulder Planning & Development Services. Accessed October 9, 2026.
- Accessory Dwelling Unit (ADU) Guide, City of Boulder Planning & Development Services. Accessed October 9, 2026.
- Accessory Dwelling Units, Colorado Department of Local Affairs, Division of Local Government. Accessed October 9, 2026.
- House Bill 24-1152, Concerning Increasing the Number of Accessory Dwelling Units (Signed Act), Colorado General Assembly. Accessed October 9, 2026.
- Building Permits and Inspections, City of Boulder Planning & Development Services. Accessed October 9, 2026.
- Rental Housing Licensing: Long-Term, City of Boulder Planning & Development Services. Accessed October 9, 2026.
- ADU Supportive Jurisdictions, Colorado Department of Local Affairs, Division of Local Government. Accessed October 9, 2026.
- Accessory Dwelling Unit (ADU) Finance Programs, Colorado Housing and Finance Authority. Accessed October 9, 2026.