Building an ADU in Rancho Cucamonga

City code and California law · Last reviewed October 10, 2026

Rancho Cucamonga rewrote its ADU ordinance in December 2025. A detached ADU can be up to 1,200 sq ft and 16 feet tall (18 feet near major transit), an attached ADU up to half the size of the house or 1,200 sq ft, whichever is less, and side and rear setbacks are 4 feet. Lots of 20,000 sq ft or more can add an extra ADU. You apply for a building permit through the city's Online Permit Center, and the city must decide within 60 days of a complete application. The city's 2024 ADU handbook predates the new ordinance, so check the code for current numbers. [1][2][3]

Rancho Cucamonga at a glance

Which rules apply
Development Code Chapter 17.100 Ordinance No. 1049, Dec. 3, 2025 [1]
Number on a single-family lot
One ADU and one junior ADU under the code's categories, plus one more ADU on lots of 20,000 sq ft or more HCD says state law also allows a converted ADU, a new detached ADU of up to 800 sq ft and a JADU together [1][4]
Detached ADU size
350 to 1,200 sq ft [1]
Attached ADU size
220 sq ft to 50% of the house or 1,200 sq ft, whichever is less [1]
Junior ADU
220 to 500 sq ft inside a single-family home (including an attached garage) One per lot [1]
Height
Detached: 16 ft 18 ft near major transit (20 ft to match the roof pitch) or on a multi-story apartment lot. Attached: 25 ft [1]
Side and rear setbacks
4 ft None for an ADU inside an existing structure or rebuilt in the same place and size [1]
Parking
1 space for a new detached ADU unless exempt None for a JADU; converted garage parking need not be replaced [1]
Building and Safety new-construction fee (FY 2026-27)
R3 ADU: $1,822 up to 500 sq ft, plus $44 per extra 100 sq ft Pre-approved ADU plan: $1,363 [5]
Owner occupancy
None for ADUs The city requires it for every JADU (state law since 2026: only if the JADU shares a bathroom) [1][3][4]
Approval deadline
60 days after a complete application 30 days for a pre-approved detached ADU plan [1]
Short-term rental
Not allowed: rentals must be longer than 30 consecutive days [1]
On this page
  1. At a glance
  2. Which rules apply in Rancho Cucamonga
  3. What you can build
  4. Size, height and setbacks
  5. Parking and garage conversions
  6. Design standards
  7. Fees
  8. How long it takes
  9. Junior ADUs
  10. Renting, selling and unpermitted units
  11. Permit steps
  12. Who to call
  13. Questions people ask

Which rules apply in Rancho Cucamonga

The rules are in Chapter 17.100 of the Development Code, adopted as Ordinance No. 1049 on December 3, 2025. They apply to all lots zoned for single-family or multifamily homes, including mixed-use zones.

The city's ADU Handbook is dated May 2024, before the new ordinance. Some of its numbers are now out of date. For example, it gives attached ADUs a height limit of the house's height or 16 feet, whichever is higher (the code now says 25 feet), and it limits apartment lots to two detached ADUs (the code now allows up to eight). The handbook itself says that where it and the Municipal Code differ, "the standards found in the Municipal Code shall prevail."

State law sets the floor for what any California city must allow; see our California page. [1][3]

What you can build

Chapter 17.100 starts with the four kinds of ADUs that state law makes cities approve under simpler rules:

The code says the new detached ADU "may be combined with a JADU." HCD's handbook goes further: it says cities must let these categories be combined, so a single-family lot can have a converted ADU, a new detached ADU and a JADU. Ask Planning how the city applies this to your lot.

Big lots. On a lot of at least 20,000 sq ft with a single-family home, you can add one more ADU, attached, detached or converted. It must meet the full development standards below and is approved without a hearing.

ADUs that don't fit those categories, such as a detached ADU over 800 sq ft, follow the development and design standards in the rest of the chapter. [1][4]

Size, height and setbacks

For ADUs outside the state's four categories, Table 17.100.050-1 of the code sets:

HCD's handbook says a city's minimum size can't rule out an efficiency unit, which can be as small as 150 sq ft. Rancho Cucamonga's minimums are 220 sq ft (attached) and 350 sq ft (detached), so ask Planning if you want a smaller unit. [1][4]

Parking and garage conversions

A newly built detached ADU needs one parking space, which can be tandem, in a garage or in a setback area. If the space is in a garage shared with the house, it must be walled off with its own garage door. The ADU must generally use the same driveway as the house, and a driveway to required parking must be at least 10 feet wide.

No parking is required when the ADU is:

A JADU needs no parking. If you convert or demolish a garage, carport or covered parking to build an ADU, you don't have to replace those spaces "as long as the ADU remains in use as a legal ADU." See our garage conversion guide. [1]

Design standards

ADUs and JADUs outside the state's four categories that are in the front yard, next to the house, or visible from the street must meet these design standards:

[1]

Fees

The city's fee schedule for fiscal year 2026-27 (effective July 1, 2026) lists these Building and Safety fees for residential new construction, including mechanical, electrical and plumbing:

Building fees are subject to an additional 12% technology fee and/or a 10% General Plan Maintenance Fee unless the schedule says otherwise.

Other agencies may review the plans or charge fees before the city issues a permit. These include the Cucamonga Valley Water District, Rancho Cucamonga Municipal Utility, Southern California Edison, SoCalGas, the Fire District, your HOA, and the local school districts.

Under state law, an ADU with 750 sq ft of interior livable space or less pays no impact fees, and a larger one pays in proportion to the size of the house. ADUs under 500 sq ft don't pay school impact fees. For typical building costs see our ADU cost guide. [4][5][6]

How long it takes

The code says an ADU or JADU application "shall be approved or denied within 60 days after the city receives the completed application." An application using a pre-approved detached ADU plan must be approved or denied within 30 days. Minor exceptions from the ADU rules aren't allowed.

State law also requires a written completeness decision within 15 business days. The city's handbook says to expect at least two rounds of comments, with several weeks for each round. See our ADU permit process guide. [1][3][4]

Junior ADUs

A JADU is 220 to 500 sq ft, not counting a shared bathroom, entirely within the walls of a single-family home, which can include an attached garage. JADUs aren't allowed in detached accessory buildings. It needs its own exterior entrance and an efficiency kitchen with a cooking appliance, counter and storage. If it shares a bathroom with the house, it needs an interior entry too. See our junior ADU guide.

Owner occupancy. The code says the owner "must reside in either the remaining portion of the primary dwelling or in the newly created JADU." Since 2026, state law requires that only when the JADU shares bathroom facilities with the house. Ask Planning how the city applies the rule to a JADU with its own bathroom. [1][4]

Renting, selling and unpermitted units

You don't have to live on the property to have an ADU. Any rental of an ADU or JADU must be for more than 30 consecutive days, so short-term rentals aren't allowed. An ADU can't be sold separately from the house unless a qualified nonprofit built the ADU or the house and the other conditions listed in the code, such as affordability restrictions, are met.

Unpermitted units. For an ADU or JADU built without permits before January 1, 2020, the city won't deny a permit because it doesn't meet building or ADU standards. The exception is when a fix is needed for health and safety. You won't pay impact fees or connection charges to legalize it, except in limited cases. You can get a confidential inspection from a licensed contractor first. [1][3]

Permit steps in Rancho Cucamonga

  1. Talk to Planning about your lot

    Email Planning@CityofRC.us or call 909-477-2750 to discuss options and site issues such as slopes, septic systems or existing accessory structures. [3][7]

  2. Check septic, fire and solar rules

    If you're on septic, check with Building and Safety early; projects within 300 feet of an existing sewer must connect to it. Lots in the Wildland-Urban Interface Fire Area need a defensible-space landscaping plan, and new detached ADUs generally need solar. [3]

  3. Prepare plans

    Use the city's residential submittal requirements for ADUs. Depending on the ADU's type, size and height, Planning may also need to clear the plans. [3][6]

  4. Apply online

    Create your building permit application in the Online Permit Center. Building and Safety takes all plan submittals electronically and doesn't issue permits over the counter. [2]

  5. Respond to plan check and other agencies

    Expect at least two rounds of comments. Water, utility, fire and school agencies, and your HOA, may also need to review the plans or collect fees. [3][6]

  6. Pay fees and get the permit

    Permits are issued by email through the permit technicians at EDRnotification@CityofRC.us and the Online Permit Center. [2]

  7. Build and pass inspections

    For inspection questions, text (909) 303-1786 or call (909) 477-2710. [2]

Who to call

Questions people ask

How big can an ADU be in Rancho Cucamonga?

A detached ADU can be 350 to 1,200 sq ft. An attached ADU can be 220 sq ft up to 50% of the house or 1,200 sq ft, whichever is less. A JADU can be up to 500 sq ft. [1]

Can I build two ADUs in Rancho Cucamonga?

HCD's handbook says state law lets you combine a converted ADU, a new detached ADU of up to 800 sq ft and a JADU on a single-family lot; the city's code says the detached ADU 'may be combined with a JADU,' so confirm with Planning. On lots of 20,000 sq ft or more, the code also allows one additional ADU. [1][4]

Does Rancho Cucamonga have pre-approved ADU plans?

The code says pre-approved plans are available on the Building and Safety pages and an application using one must be decided within 30 days, and the fee schedule lists a $1,363 Pre-Approved ADU Plan fee. When we checked in October 2026, the city's Building and Safety and AB 1332 pages explained the state requirement but didn't list any plans, so ask Building and Safety. [1][2][5][6]

Can I put an ADU in my front yard?

The front setback normally applies, but the code waives it when it would block an 800 sq ft ADU that is 16 feet tall with 4-foot side and rear setbacks. Front-yard ADUs outside the state's four categories must also meet the city's design standards. [1]

Can I Airbnb my ADU in Rancho Cucamonga?

No. ADUs and JADUs must be rented for more than 30 consecutive days. [1]

Sources (7)
  1. Chapter 17.100: Accessory Dwelling Units and Junior Accessory Dwelling Units (Ord. No. 1049, 12/3/2025), City of Rancho Cucamonga (eCode360). Accessed October 10, 2026.
  2. Building & Safety, City of Rancho Cucamonga. Accessed October 10, 2026.
  3. Accessory Dwelling Unit Handbook (May 2024), City of Rancho Cucamonga. Accessed October 10, 2026.
  4. Accessory Dwelling Unit Handbook (March 2026), California Department of Housing and Community Development. Accessed October 10, 2026.
  5. Fiscal Year 2026-27 Fee Schedule (effective July 1, 2026), City of Rancho Cucamonga. Accessed October 10, 2026.
  6. Assembly Bill 1332, City of Rancho Cucamonga Building & Safety. Accessed October 10, 2026.
  7. Planning, City of Rancho Cucamonga. Accessed October 10, 2026.