Building an ADU in Raleigh

City code and North Carolina law · Last reviewed October 9, 2026

Raleigh allows accessory dwelling units (ADUs) in the R-1, R-2, R-4, R-6, R-10, RX, OX, NX, DX and CX zoning districts. In residential districts, an ADU can be up to 800 square feet on lots of 40,000 square feet or less, or 1,000 square feet on larger lots, and up to 26 feet tall. It must be smaller than the main home. No extra parking is required. You apply through the city's Permit and Development Portal. [1][2][3]

Raleigh at a glance
Zoning districtsR-1, R-2, R-4, R-6, R-10, RX, OX, NX, DX and CX [2]
TypesDetached, attached or internal; may be above a garage [1]
How manyOne per lot; up to two in a Frequent Transit Area (only one of them attached) [1]
Max size (residential districts)800 sq ft on lots of 40,000 sq ft or less; 1,000 sq ft on lots over 40,000 sq ft; always smaller than the main home [1]
Detached ADU setbacks (lots under 10,000 sq ft)5 ft side and rear; 10 ft from a side street; at or behind the front wall of the house [1]
Height26 ft maximum [1]
ParkingNo additional parking required [2]
FoundationPermanent foundation; no ADUs on wheels (limited manufactured homes up to 600 sq ft allowed) [1][2]
SellingCan't be sold apart from the main home [1][2]
Owner-buildersIf you build it yourself under the owner exemption, you must sign a Not For Rent statement [2]
Flag lotsADUs are not permitted on flag lots [1]
Short-term rentalNeeds a city zoning permit [9]
On this page
  1. At a glance
  2. What you can build here
  3. Size, height and setbacks
  4. Parking
  5. What changes with the 2027 state law
  6. Fees and timeline
  7. Garage conversions and internal ADUs
  8. Renting it out and building it yourself
  9. Permit steps
  10. Pre-approved plans
  11. Who to call
  12. Questions people ask

What you can build here

Raleigh's Unified Development Ordinance (UDO) defines an ADU as "a self-contained dwelling unit that is located on the same lot as a principal dwelling." It may be detached, attached or inside the main home, including above a garage. It must have a lockable outside entrance, and its entrances must be reachable on foot from the driveway, street or alley.

In residential districts, an ADU can go on a lot with an existing detached house or tiny house, or with an attached house, townhouse or tiny house used as two-unit living, or with a townhouse. The city's FAQ lists the districts as R-1, R-2, R-4, R-6, R-10, RX, OX, NX, DX and CX.

You can have one ADU per lot. In a Frequent Transit Area shown in the Comprehensive Plan you can have two, but only one can be attached to the main home, and a townhouse lot is limited to one.

The ADU must sit on a permanent foundation. It can be a manufactured home only if it is 600 square feet or less and meets roof pitch, eave, wall height, siding and skirting rules. ADUs are not allowed on flag lots. Check with your HOA too, since the city says to ask whether ADUs are allowed in your neighborhood. [1][2]

Size, height and setbacks

These are the limits in residential districts under UDO Section 2.6.3. Mixed-use districts follow Section 3.6.2.

Size. The ADU's gross floor area must be less than the main home's. The maximum is 800 square feet on lots under 10,000 square feet and on lots of 10,000 to 40,000 square feet, and 1,000 square feet on lots over 40,000 square feet. Gross floor area includes all conditioned space plus any attached unconditioned space. The city's FAQ says ADUs are "typically between 450-800 square feet."

Detached ADU setbacks:

Height. Up to 26 feet.

Separation. Unless it is built into another building, an ADU must be at least 6 feet from any other building on the lot. [1][2]

Parking

The city's FAQ says: "No. Additional parking does not have to be provided with an ADU." North Carolina's new ADU law also bars covered cities from setting minimum parking requirements for ADUs from January 15, 2027. [2][4]

What changes with the 2027 state law

Session Law 2026-59 adds G.S. 160D-917, which covers cities of 50,000 or more outside the coastal area. The state demographer estimated Raleigh's population at 504,445 on July 1, 2025. For ADU permit applications filed on or after January 15, 2027, the city must allow at least one ADU with each single-family detached home in residential areas that allow those homes, and must adopt rules by July 1, 2027.

Raleigh's size limits of 800 and 1,000 square feet already fall within the state's range, and the state law lets cities require that an ADU be smaller than the main house. The state law also bars fees higher than for a similar single-family home and says a permitted ADU's parcel can't be subdivided to separate the ADU.

The state law caps the setback a city can require for an ADU at 10 feet, or the zone's general setback if that is less. Raleigh's UDO requires a detached ADU to be 15 feet from a side street on lots of 10,000 square feet or more, and 20 feet from an alley when there is parking.

The UDO currently bars ADUs on flag lots. The state law doesn't list flag lots as an exception. Ask the city how these rules will apply to applications from January 15, 2027. See our North Carolina ADU law page. [1][4][5]

Fees and timeline

Raleigh doesn't list ADU fees on its ADU page. A plan review fee is due before your project is reviewed, and all other permit fees are due when the permits are ready to issue. Use the city's development fee guide and calculator to estimate them.

The city posts standard review turnaround times online. State law requires the first review of residential building plans within 15 business days, with partial fee refunds if it takes more than 20 business days. If your project adds 800 square feet or more of impervious surface, it must also meet the city's lot grading plan requirements.

See our ADU cost guide for budgeting. [3][6][7]

Garage conversions and internal ADUs

Finishing an existing detached garage as an ADU uses the city's ADU Change-of-Use process, as does converting space inside your house. An ADU above a garage is allowed. If your main home is a duplex, only one of the two units may add an internal ADU, and that review is under the North Carolina Commercial Code.

The city's FAQ says all ADUs must meet the fire-resistant separation rules in the North Carolina Residential Building Code. See our garage conversion guide. [1][2][3]

Renting it out and building it yourself

You can't sell an ADU apart from its main home. You can rent it, unless you built it yourself under the owner-builder exemption. In that case, the city says "a statement from the owner that the ADU will be built solely as Not For Rent is required prior to permit issuance."

The city's FAQ gives two different thresholds for needing a licensed general contractor: projects valued over $40,000 in one answer and over $30,000 in another. State law sets the threshold at $40,000 or more. Confirm with the Permit Helpline at 919-996-2500.

Short-term rentals of 30 days or less need a city zoning permit first, and part or all of an accessory structure can be used. Renters can't hold special events in residential districts, and the permit number must appear on all ads. See our guide to hiring ADU help. [1][2][8][9][10]

Permit steps in Raleigh

  1. Check your zoning and design rules

    Confirm your zoning district and read UDO Section 2.6.3 (residential districts) or Section 3.6.2 (mixed-use districts). In a historic overlay district, get a Certificate of Appropriateness before construction. [1][2]

  2. Pick the right permit path

    A new detached ADU follows the New Single-Family Dwelling process. Finishing an existing detached garage or converting interior space follows the ADU Change-of-Use process, and an attached ADU that adds square footage follows the Accessory Structure and Addition process. See Building an ADU. [3]

  3. Choose plans

    You can hire a designer or buy a plan from the city's ADU Fast Track gallery. Fast Track ADUs follow the new single-family dwelling process. [3]

  4. Register and gather documents

    Register in the Permit and Development Portal and enter all contractor information. Prepare the Residential Permit Application, a site plan or survey, the Residential Permit Data Form, lien agent details and construction drawings with elevations. Owner-builders also file the Owner Exemption Affidavit. [6]

  5. Submit and pay the plan review fee

    Upload all forms and documents as PDFs in the portal. A plan review fee is due before review; check the city's development fee guide. [6]

  6. Respond to comments and get your permit

    You'll get email updates and can read review comments in the portal. All other permit fees are due when the permits are ready to issue. [6]

  7. Build and pass inspections

    Schedule inspections through the portal as work progresses. [6]

Pre-approved and sample plans

Who to call

Questions people ask

How big can an ADU be in Raleigh?

In residential districts, up to 800 square feet on lots of 40,000 square feet or less and 1,000 square feet on larger lots. The ADU must also be smaller than the main home. [1]

Do I need extra parking for an ADU in Raleigh?

No. The city says additional parking does not have to be provided with an ADU. [2]

Can I have two ADUs in Raleigh?

Only in a Frequent Transit Area shown in the city's Comprehensive Plan, and only one of the two can be attached to the main home. Elsewhere the limit is one ADU per lot. [1]

Can I rent out an ADU I built myself in Raleigh?

No. If you build under the owner-builder exemption, you must give the city a signed statement that the ADU is Not For Rent before the permit is issued. [2]

Can my ADU be a tiny house on wheels in Raleigh?

No. The ADU must be on a permanent foundation. A manufactured home up to 600 square feet can qualify if it meets the UDO's design rules. [1][2]

Sources (10)
  1. Raleigh UDO Sec. 2.6.3. Accessory Dwelling, City of Raleigh. Accessed October 9, 2026.
  2. ADU FAQs, City of Raleigh Planning and Development. Accessed October 9, 2026.
  3. Building an Accessory Dwelling Unit (ADU), City of Raleigh Planning and Development. Accessed October 9, 2026.
  4. Session Law 2026-59 (Senate Bill 445), Regulatory Reform Act of 2026, North Carolina General Assembly. Accessed October 9, 2026.
  5. Aspects of Municipal Population Change (Vintage 2025 estimates), North Carolina Office of State Budget and Management. Accessed October 9, 2026.
  6. Building a New Single-Family Dwelling or Duplex, City of Raleigh Planning and Development. Accessed October 9, 2026.
  7. G.S. 160D-1110, Building permits, North Carolina General Assembly. Accessed October 9, 2026.
  8. G.S. 87-1, General contractor defined; exceptions, North Carolina General Assembly. Accessed October 9, 2026.
  9. Raleigh UDO Sec. 6.4.6. Overnight Lodging (Short-Term Rental), City of Raleigh. Accessed October 9, 2026.
  10. How to Get Assistance With Your Permit or Project, City of Raleigh Planning and Development. Accessed October 9, 2026.