Building an ADU (casita) in Scottsdale

City code and Arizona law · Last reviewed November 3, 2026

Scottsdale allows one attached and one detached accessory dwelling unit (ADU, often called a casita) on a single-family lot that already has a house, plus a third detached ADU on a lot of an acre or more if one is a deed-restricted affordable unit. The first ADU can be 75% of the main home's floor area or 1,000 square feet, whichever is less; any other ADU on the lot is capped at 500 square feet. A detached ADU in the rear yard can sit 5 feet from the side and rear property lines.

Unlike a guest house, an ADU has its own kitchen and can be rented separately. You start with an online pre-application, then get an administrative approval from the Zoning Administrator before you apply for building permits. The One Stop Shop answers questions at 480-312-2500. [1][2][3][4]

Scottsdale at a glance

How many
One attached and one detached ADU A third detached ADU on lots of 1 acre or more if one is a restricted-affordable unit [1][2]
Where allowed
Single-family lots that already have a main home In single-family or multifamily zones, not commercial zones [2][3]
Max size
First ADU: 75% of the main home or 1,000 sq ft, whichever is less Every other ADU on the lot: 500 sq ft [2][3]
Setbacks
Attached: same as the house Detached: not in the required front or side yard, 5 ft from side and rear lines when in the rear yard; 10 ft from the house [1][2]
Height
Up to the height limit of the zoning district [2]
Parking
No added parking for the ADU, but the main home's required parking must stay or be replaced on the lot [2]
Occupancy
No more than six adults in total across the main home and all ADUs on the lot [2]
Short-term rental
Allowed with a city license ($250 a year) The owner must live on the property for an ADU that got its certificate of occupancy on or after Sept. 14, 2024 [3][12][14]
Utilities
Separately metered electric and gas Water and sewer rules differ between the code and the city's ADU page (see below) [1][2]
Selling separately
Not allowed The lot can't be split or condo-platted to separate the ADU [2][3]
City review fee
$131 pre-application plus $131 ADU staff approval (FY 2026/27), before building permit fees [10]
On this page
  1. At a glance
  2. What you can build in Scottsdale
  3. ADU or guest house?
  4. Size, height and setbacks
  5. Parking
  6. Utilities
  7. Fees and timeline
  8. Renting your ADU
  9. Pre-approved plans
  10. Permit steps
  11. Who to call
  12. Questions people ask

What you can build in Scottsdale

Arizona's ADU law, ARS 9-461.18 (HB 2720, 2024), "applies to a municipality with a population of more than seventy-five thousand persons." Scottsdale adopted its ADU rules in Ordinance 4652 (November 2024) and amended them with Ordinance 4687 on Sept. 30, 2025, after HB 2928 shrank the airport areas where ADUs could be barred. The city says ADUs have been allowed since January 1, 2025. The rules are in Zoning Ordinance Sections 7.900 to 7.904; as of November 2026 the online code still showed the older airport wording, so the Ordinance 4687 text has the current version of that rule. See our Arizona ADU law page.

Scottsdale recognizes three types of ADU:

An ADU must have its own sleeping, kitchen and sanitary facilities. It can only be built after the main home has its certificate of occupancy. Existing buildings, or part of one, can be converted if they meet the same rules. The city says any ADU that existed before the new rules is illegal until it is approved under them. [1][2][3][5][6][7]

ADU or guest house?

Scottsdale treats a guest house and an ADU as different uses. A guest house is a detached building for guests of the people living in the main home. It can't be rented separately, must share utilities with the main home, and all guest houses on a lot together can be up to half the main home's floor area. A guest house built after January 1, 2025 needs a recorded private deed restriction limiting it to guest house use before the permit is approved. It goes straight to building permits, with no administrative ADU review.

An ADU can be attached or detached, must have its own kitchen and separately metered utilities, and can be rented. The city says an existing guest house can become an ADU if the owner shows it meets the ADU rules and gets approval. See the city's guest house page. [1][3][8]

Size, height and setbacks

Size. Only one ADU on a lot can be as large as 75% of the main home's gross floor area or 1,000 square feet, whichever is less. Every other ADU on the same lot is limited to 500 square feet.

Height. An ADU can't be taller than the height allowed in its zoning district.

Setbacks. An attached ADU follows the setbacks for the main home. A detached ADU can't go in the required front yard (including the front yard on the longer street side of a corner lot) or in a required side yard. A detached ADU in the rear yard can be built 5 feet from a side or rear property line. Each ADU must be at least 10 feet from the main home and from any other ADU.

Other standards. Each ADU needs its own exterior entrance, a path to the street that doesn't go through the main home, its own address, and private outdoor space next to it of at least 5 feet deep and 50 square feet. The zoning district's other development standards still apply unless the ADU section says otherwise.

How this lines up with state law. ARS 9-461.18 requires cities to allow "at least one attached and one detached accessory dwelling unit as a permitted use" and "an accessory dwelling unit that is seventy-five percent of the gross floor area of the single-family dwelling ... or one thousand square feet, whichever is less." It bars rear or side setbacks for ADUs "that are more than five feet from the property line." Scottsdale's code lets only one ADU on a lot reach that size and caps every other ADU at 500 square feet; Ordinance 4652's recitals describe the state allowance as "a cumulative seventy-five percent," a word the statute itself doesn't use. The code also keeps detached ADUs out of required side yards. If your plan depends on a second ADU over 500 square feet or a detached ADU in a side yard, confirm with the One Stop Shop at 480-312-2500. [1][2][4][5][9]

Parking

Scottsdale doesn't require any added parking for an ADU. But its code says an ADU "shall not reduce or eliminate any required parking for the main single-family residential dwelling," and if the ADU removes required spaces (for example, in a garage conversion), they must be replaced on the same lot where the Zoning Administrator approves.

Arizona law says a city may not "require that a lot or parcel have additional parking to accommodate an accessory dwelling unit." If you plan to convert a garage or carport, ask the One Stop Shop how the replacement rule applies to your lot. See our garage conversion guide. [1][2][5]

Utilities

Scottsdale's sources don't agree on water and sewer:

Ask the One Stop Shop which applies before you design your utility runs. The owner must also repair any public street or public property damaged while building the ADU. [1][2]

Fees and timeline

Scottsdale's FY 2026/27 application fee schedule (effective July 1, 2026) lists a $131 pre-application fee and a $131 "Development Review – Staff Approval" fee for ADUs. Building permit and plan review fees are separate and depend on the project. The city doesn't give permit fees over the phone; request an estimate through its fee estimate page. For budgeting, see our ADU cost guide.

Scottsdale's ADU sources don't give a set review time for the administrative application or the building permit. See our ADU permit process guide. [1][10][11]

Renting your ADU

Scottsdale says an ADU can be rented separately from the main home, and its code says no family, marriage or employment relationship with the owner is required. Total occupancy of the main home and all ADUs on the lot can't exceed six adults. An ADU can't be sold separately, and the lot can't be split or condo-platted to separate it.

Who must live on site. Scottsdale's sources differ:

Arizona law (ARS 9-500.39) lets a city require the owner of a short-term rental to live on the property if an ADU there got its final approval on or after September 14, 2024. ARS 9-461.18 bars a city from prohibiting the main home or an ADU from being "separately leased long-term rental housing" (90 days or more, or month to month). If you plan a long-term rental and won't live on site, confirm with the city.

Short-term rental license. Any rental of less than 30 days needs a Scottsdale vacation and short-term rental license for each property ($250 a year), an Arizona transaction privilege tax (TPT) license, at least $500,000 in liability coverage, and written notice to neighbors within 30 days of getting the license. [1][2][3][5][12][13][14]

Pre-approved plans

Arizona's pre-approved plan law, ARS 9-461.20 (SB 1529, 2025), says a city "shall establish standard preapproved housing design plans or a preapproved housing design plan program." Beginning July 1, 2026, in single-family areas that allow ADUs, it "shall create at least three standard preapproved housing design plans for accessory dwelling units," at 200, 600 or 1,000 square feet. A plan program must accept plan submissions from anyone and post approved plans on the city's website.

We didn't find a pre-approved ADU plan library on Scottsdale's website as of November 2026; its ADU page describes the pre-application, administrative review and permit review steps and doesn't mention pre-approved plans. Ask the One Stop Shop at 480-312-2500 whether pre-approved plans are available. [1][4][15]

Permit steps in Scottsdale

  1. Check your lot

    The lot must be a single-family residential lot with a finished main home that has its certificate of occupancy. ADUs aren't allowed near military airports or in some areas near other airports where noise exceeds 65 decibels; the city says parts of Scottsdale are near Phoenix Sky Harbor and Scottsdale Airport, so ask the One Stop Shop whether your lot is affected. In northern Scottsdale, the ADU can't go in required Natural Area Open Space (NAOS). Check any HOA rules too. [2][3][6][7]

  2. Submit a pre-application

    Start with an online Pre-Application request. The city encourages you to include a site plan, building elevations and utility information. The pre-application fee is $131. [1][10]

  3. Pre-application meeting

    City staff schedule a meeting with you to go over the requirements for your proposed ADU. [1]

  4. Formal application for administrative review

    After the pre-application, staff tell you how to file a development application for administrative review ($131 for an ADU staff approval). It must show a site plan, the main home's floor area, ADU plans that meet the size and setback rules, and utility connections. The Zoning Administrator can approve, approve with stipulations, or deny it, and the code says that decision is not appealable. [1][2][10]

  5. Building permit review

    Once the administrative application is approved, you or your designer submit construction documents for permit review. A permit is issued after all code requirements are met. For a fee estimate, use the city's fee estimate request; estimates take 2 to 3 business days. [1][11]

  6. Build, address and inspect

    Each ADU needs its own address, posted near its entrance and visible from the main street frontage, plus a separate exterior entrance and a path to the street that doesn't pass through the main home. [2]

Who to call

Questions people ask

How big can an ADU be in Scottsdale?

The first ADU on a lot can be 75% of the main home's gross floor area or 1,000 square feet, whichever is less. Any other ADU on the same lot is limited to 500 square feet. Height can't exceed the zoning district's limit. [2][3]

How close to the property line can a casita be in Scottsdale?

A detached ADU in the rear yard can be 5 feet from the side and rear property lines. It can't be in the required front yard or a required side yard, and it must be at least 10 feet from the main home. An attached ADU follows the main home's setbacks. [2]

What's the difference between a guest house and an ADU in Scottsdale?

A guest house is for guests only: it can't be rented, shares utilities with the main home, needs a recorded deed restriction if built after January 1, 2025, and all guest houses together can be up to half the main home's size. An ADU has its own kitchen, separately metered utilities, needs an administrative approval, and can be rented. [1][8]

Can I Airbnb my ADU in Scottsdale?

Yes, with a Scottsdale short-term rental license ($250 a year). If the ADU got its certificate of occupancy on or after September 14, 2024, you must live on the property as your primary residence. A restricted-affordable ADU can't be a short-term rental. [2][12][14]

How do I get an ADU permit in Scottsdale?

Submit an online pre-application ($131), meet with city staff, then file a formal application for administrative review ($131). After the Zoning Administrator approves it, submit construction plans for building permit review. Call the One Stop Shop at 480-312-2500 with questions. [1][4][10]

Sources (15)
  1. Accessory Dwelling Units (ADUs), City of Scottsdale. Accessed November 3, 2026.
  2. Zoning Ordinance, Sections 7.900-7.904: Accessory Dwelling Units, City of Scottsdale (Municode). Accessed November 3, 2026.
  3. Accessory Dwelling Units in Scottsdale (ADU FAQ), City of Scottsdale Planning and Development. Accessed November 3, 2026.
  4. Legislative Updates (One Stop Shop contact), City of Scottsdale Planning and Development. Accessed November 3, 2026.
  5. 9-461.18. Accessory dwelling units; regulation; applicability; definitions, Arizona State Legislature. Accessed November 3, 2026.
  6. Council amends zoning ordinance in response to state legislation, City of Scottsdale. Accessed November 3, 2026.
  7. Ordinance No. 4687, Exhibit A: Accessory Dwelling Unit (ADU) Text Amendment (4-TA-2024#2, final legislative text), City of Scottsdale. Accessed November 3, 2026.
  8. Guest Houses, City of Scottsdale. Accessed November 3, 2026.
  9. Ordinance No. 4652 (4-TA-2024), City of Scottsdale City Clerk. Accessed November 3, 2026.
  10. Application Fee Schedule (effective July 1, 2026), City of Scottsdale Planning and Development Services. Accessed November 3, 2026.
  11. Request Permit Fee Estimate, City of Scottsdale Planning and Development. Accessed November 3, 2026.
  12. Zoning Ordinance, Section 7.203: Vacation rentals or Short-term rentals, City of Scottsdale (Municode). Accessed November 3, 2026.
  13. 9-500.39. Vacation rentals; short-term rentals; definitions, Arizona State Legislature. Accessed November 3, 2026.
  14. Information for Owners and Operators (Vacation and Short-Term Rentals), City of Scottsdale. Accessed November 3, 2026.
  15. 9-461.20. Municipal housing; standard preapproved housing design plans; indemnification; definition, Arizona State Legislature. Accessed November 3, 2026.